<br />THE CITY OF SUNNY ISLES BEACH <br />PROJECT NO. 21-1011 <br />BUILDING DEPARTMENT RELOCATION TO ANNEX <br /> <br />Project No. 21-1011 November 2024 013300 Request For Information-2 <br />C. RFI Processing Procedure. <br /> <br />1. Upon receipt of the RFI, the Representative shall promptly date stamp the request. <br />The Representative is required to keep a log of all RFIs including receipt date and <br />date returned to the Contractor. <br /> <br />2. The Architect/Engineer of Record shall review the request to determine if further <br />information is required from the Contractor, once the RFI is resubmitted by the <br />Contractor, the RFI shall be restamped. The Architect/Engineer of Record will <br />coordinate a response and transmit the answer to the RFI via the Representative to <br />the Contractor. <br /> <br />D. Time allowed for processing RFIs. <br /> <br />1. Although every attempt will be made to expeditiously resolve all RFIs, MDC shall have <br />(10) working days to respond to an RFI, from the date the RFI is received by the <br />Representative, including all necessary information needed to formulate a response. <br />Failure by the Contractor to allow sufficient time for MDC to formulate a response to <br />an RFI, as specified in this section, shall not constitute grounds for a delay claim <br />from the Contractor. <br /> <br />3.2 ATTACHMENTS: <br /> <br />A. Attachment 20 dated March 01, 2005, Request for Information <br /> <br />B. Attachment 21 dated March 01, 2005, Request for Information response <br /> <br />PART 4 - MEASUREMENT AND PAYMENT <br /> <br />4.1 MEASUREMENT <br /> <br />A. Work under this Section will not be separately measured for payment. <br /> <br /> <br /> <br />END OF SECTION