Laserfiche WebLink
THE CITY OF SUNNY ISLES BEACH <br />PROJECT NO. 21-1011 <br />BUILDING DEPARTMENT RELOCATION TO ANNEX <br /> <br />Project No. 21-1011 November 2024 072600 Vapor Retarder-3 <br />4. Puncture Resistance (ASTM E154): Not less than 40 lb. (178 N) when stretched by <br />blunt object. <br />5. Permeance of In-Place System (ASTM E283): Not more than 0.25 cubic feet per <br />minute per square foot (0.01 l/s/m2) when tested with a pressure difference of 75 <br />Pa. <br /> <br />6. Resistance to 2 kPa Air Pressure Difference (ASTM E283): No increase in equivalent <br />leakage area. <br /> <br />7. Permeance - Metric Perms (ASTM E96 (Method B)): Not more than 0.009 perm <br />(0.517 ng/ (Pa x s x m2)). <br /> <br />2.3 ACCESSORIES <br /> <br />A. No. 100 Primer. <br /> <br />B. No. 100 VOC Primer. <br /> <br />C. No. 6000 Water-Based Primer. <br /> <br />D. Protecto Sealant 25XL. <br /> <br />E. JS160H Mastic. <br /> <br />PART 3 - EXECUTION <br /> <br />3.1 MANUFACTURER'S INSTRUCTIONS <br /> <br />A. Compliance: Comply with manufacturer's product data, including product technical <br />bulletins, product catalog installation instructions and product carton instructions for <br />installation. <br /> <br />3.2 EXAMINATION <br /> <br />A. Site Verification of Conditions: Verify that substrate conditions, which have been previously <br />installed under other sections, are acceptable for product installation in accordance with <br />manufacturer's instructions. <br /> <br />3.3 PREPARATION <br /> <br />A. Prepare surfaces using the methods recommended by the manufacturer for achieving the <br />best result for the substrate under the project conditions. <br /> <br />END OF SECTION