My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Attachment C - Biddding Specification 1-23-25
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(25-01-01) City Annex Building Construction Renovations
>
INVITATION TO BID 25-01-01 CITY ANNEX BUILDING CONSTRUCTION RENOVATIONS
>
Attachment C - Biddding Specification 1-23-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2025 9:22:18 AM
Creation date
2/20/2025 9:18:50 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
City Annex Building Construction Renovations
Bid No. (xx-xx-xx)
25-01-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
960
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THE CITY OF SUNNY ISLES BEACH <br />PROJECT NO. 21-1011 <br />BUILDING DEPARTMENT RELOCATION TO ANNEX <br />Project No. 21-1011 November 2024 076200 Flashing and Sheet Metal-6 <br /> <br /> <br /> <br /> <br /> <br /> <br />4. Asphalt primer: <br /> <br />Test Typical Value Test Method <br />Asbestos Content 0% EPA/600/R-93/116 <br />Viscosity 30 - 60 cps ASTM D 2196 <br />Density 7.2 lbs/gal. ASTM D 1475 <br />Solids by Weight 43% ASTM D 4479 <br />Flash Point 101ºF minimum ASTM D 93 <br /> <br /> <br />PART 3 - EXECUTION <br /> <br />3.1 INSPECTION <br /> <br />A. Do not proceed with the work of this section until conditions detrimental to the proper and <br />timely completion of the work have been corrected in an acceptable manner. <br /> <br />B. Before installing sheet metal, verify shapes and dimension of surfaces to be covered. <br /> <br />C. Verify that substrates are smooth and clean to extent needed for sheet metal work. <br /> <br />D. Verify that reglet, nails, cants, and blocking, to receive sheet metal are installed and free <br />of concrete and soil. <br /> <br />E. Correct unsatisfactory conditions before proceeding with this work. <br /> <br />F. Verify that surfaces, which are inaccessible after fabrication or installation, are shop prime <br />coated. <br /> <br />3.2 BASE FLASHINGS <br />A. Preparation: <br /> <br />1. Remove existing flashing materials to substrate. Replace damaged material in like <br />kind. <br />2. Prime vertical substrate with asphalt primer at approximate rate of one gallon per <br />125 – 150 sq. ft. <br />3. Install new roofing two inches beyond top edge of cant. <br /> <br />B. Base ply(s): <br /> <br />1. Fully adhere one (1) ply of specified base flashing completely to flashing substrate, <br />cant, and roofing. Flashing should extend a minimum of 8" and maximum of 14”
The URL can be used to link to this page
Your browser does not support the video tag.