My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Attachment C - Biddding Specification 1-23-25
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(25-01-01) City Annex Building Construction Renovations
>
INVITATION TO BID 25-01-01 CITY ANNEX BUILDING CONSTRUCTION RENOVATIONS
>
Attachment C - Biddding Specification 1-23-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2025 9:22:18 AM
Creation date
2/20/2025 9:18:50 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
City Annex Building Construction Renovations
Bid No. (xx-xx-xx)
25-01-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
960
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THE CITY OF SUNNY ISLES BEACH <br />PROJECT NO. 21-1011 <br />BUILDING DEPARTMENT RELOCATION TO ANNEX <br /> <br />Project No. 21-1011 November 2024 079000 Joint Protection-3 <br /> <br /> <br />C. Joint Backing: Expanded or extruded closed-cell polyethylene for joint open in back and joints <br />requiring filler to create proper depth and polyethylene bond breaker tape for joints closed in <br />back. <br /> <br />D. Bond Breaker: Pressure sensitive tape recommended by sealant manufacturer to suit <br />application. <br /> <br />PART 3 - EXECUTION <br /> <br />3.1 EXAMINATION <br /> <br />A. Verify that surfaces and joint openings are ready to receive work and field measurements are <br />as shown on Drawings and recommended by the manufacturer. <br /> <br />B. Beginning of installation means installer accepts existing surfaces. <br /> <br />3.2 PREPARATION <br /> <br />A. Clean joints in accordance with manufacturer's instructions. <br /> <br />B. Remove loose materials and foreign matter which might impair adhesion of sealant. <br /> <br />C. Verify that joint backing and release tapes are compatible with sealant. <br /> <br />D. Perform preparation. <br /> <br />E. Protect elements surrounding the work of this Section from damage or disfiguration. <br /> <br />3.3 INSTALLATION <br /> <br />A. Install sealant in accordance with manufacturer's instructions. <br /> <br />B. Measure joint dimensions and size materials to achieve required width/depth ratios. <br /> <br />C. Install joint backing to achieve a neck dimension no greater than 1/3 the joint width. <br /> <br />D. Install bond breaker where joint backing is not used. <br /> <br />E. Apply sealant within recommended application temperature ranges. Consult manufacturer <br />when sealant cannot be applied within these temperature ranges. <br /> <br />F. Install sealant free of air pockets, foreign embedded matter, ridges, and sags. <br /> <br />G. Tool joints concave. <br /> <br />3.4 CLEANING AND REPAIRING <br /> <br />A. Clean work under provisions of General Conditions and Supplemental General Conditions.
The URL can be used to link to this page
Your browser does not support the video tag.