My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Attachment C - Biddding Specification 1-23-25
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(25-01-01) City Annex Building Construction Renovations
>
INVITATION TO BID 25-01-01 CITY ANNEX BUILDING CONSTRUCTION RENOVATIONS
>
Attachment C - Biddding Specification 1-23-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2025 9:22:18 AM
Creation date
2/20/2025 9:18:50 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
City Annex Building Construction Renovations
Bid No. (xx-xx-xx)
25-01-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
960
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THE CITY OF SUNNY ISLES BEACH <br />PROJECT NO. 21-1011 <br />BUILDING DEPARTMENT RELOCATION TO ANNEX <br /> <br /> <br />Project No. 21-1011 November 2024 079200-8 <br /> <br /> <br />A. Joint Depths and Fillers: <br /> <br />1. Govern depth of joints to receive sealant or caulking by width of joint and achieve by <br />proper placement of joint filler-gaskets. <br /> <br />a. Joints 1/2 Inch and Less in Width: 1/4 inch deep. <br />b. Joints Between 1/2 Inch and 1 Inch in Width: Depth equal to 1/2 the <br />width. <br />c. Joints 1 Inch and Over in Width: 1/2 inch deep. <br /> <br />2. Joint fillers shall be polyethylene or butyl foam cord. <br /> <br />3. Avoid lengthwise stretching of filler materials. <br /> <br />4. Install bond breaker tape at back of joints over joint fillers other than polyethylene <br />type. <br /> <br />B. Epoxy Joint Filler: <br /> <br />1. Transfer entire contents of activator container thoroughly with entire contents of base <br />container in separate container of appropriate size. <br /> <br />2. Mix only as much material as can be applied within manufacturer’s recommended <br />application time period. <br /> <br />3. Mix with slow-speed drill (80-100 rpm) and slotted paddle. Ensure mixing paddle <br />reaches bottom and scrapes side of container several times. Scrape paddle several <br />times to ensure thorough mixing. Keep paddle blade below surface to avoid <br />whipping air into material. <br /> <br />a. Mix Epolith-P for 5 to 7 minutes. <br />b. Mix Epolith-G for 8 to 10 minutes. <br /> <br />4. Pour Epolith-GP from spouted can or professional bulk-loading caulking gun. <br />5. Apply Epolith-G by professional bulk-loading gun. <br />6. Maintain minimum joint application of 2/3 joint depth or 1 inch, whichever is greater. <br />7. Fill joints from bottom up to exterior face by holding properly sized nozzle against <br />joint bottom. <br />8. Tool joint to ensure maximum adhesion to joint sides, correct bead configuration, <br />and a neat joint. Dry tool or dampen tool with Reducer 990. Do not use water or <br />soapy water. <br />9. Apply materials only within manufacturer’s specified application life period. Discard <br />joint filler after application life is expired or if prescribed application period has <br />elapsed. <br /> <br />C. Masking: Tape where required to protect adjacent surfaces. Adhere in continuous strips in <br />alignment with joint edge and remove immediately after joints have been sealed and <br />tooled. <br /> <br />D. Sealant and Caulking Finish: <br />
The URL can be used to link to this page
Your browser does not support the video tag.