My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Attachment C - Biddding Specification 1-23-25
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(25-01-01) City Annex Building Construction Renovations
>
INVITATION TO BID 25-01-01 CITY ANNEX BUILDING CONSTRUCTION RENOVATIONS
>
Attachment C - Biddding Specification 1-23-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2025 9:22:18 AM
Creation date
2/20/2025 9:18:50 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
City Annex Building Construction Renovations
Bid No. (xx-xx-xx)
25-01-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
960
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THE CITY OF SUNNY ISLES BEACH <br />PROJECT NO. 21-1011 <br />BUILDING DEPARTMENT RELOCATION TO ANNEX <br /> <br /> <br />Project No. 21-1011 November 2024 079200-9 <br /> <br />1. Force material into the joint with a gun having a nozzle which fits properly. <br /> <br />a. Fill joints solidly, tool to compress and smooth out without thin edges, free <br />of tool marks and flush with adjoining surfaces. <br />b. Remove excess compound, smears, droppings and misplaced compound <br />before it has cured, using suitable tools and non-staining oil-free solvent. <br /> <br />2. Prepare sealants that require mixing; follow manufacturer’s recommended <br />procedures, mixing thoroughly. <br /> <br />3. Mix only as much material as can be applied within manufacturer’s recommended <br />application time period. <br /> <br />4. Apply materials in accordance with manufacturer’s recommendations; take care to <br />produce beads of proper width and depth, tool as recommended by manufacturer, <br />and immediately remove surplus sealant. <br /> <br />5. Apply materials only within manufacturer’s specified application life period. Discard <br />sealant after application life is expired or if prescribed application period has <br />elapsed. <br /> <br />E. Back-up Material: <br /> <br />1. Install appropriate size backer rod, larger than joint where necessary, according to <br />manufacturer’s recommendations. <br /> <br />2. Install polyethylene joint filler in joints wider than 1/4 inch to back-up material per <br />manufacturer’s recommendations. <br /> <br />3. Do not install epoxy joint filler over backer rod. <br /> <br />4. Install backer rod using blunt or rounded tools to assure uniform depth (+/- 1/8”) <br />without puncturing or twisting. Closed cell rod shall be a minimum 20% oversized. <br />Open cell rod shall be a minimum 50% oversized. Install bond breaker tape in <br />shallow joints. <br /> <br />F. Bond Breaker: Install bond-breaker strip in joint to be sealed on top of back-up material <br />to prevent adhesion of sealant to back-up material; install per manufacturer’s <br />recommendations. <br /> <br />3.4 SEALANT AND CAULKING LOCATIONS <br /> <br />A. Joints around door frames, window frames, thru-wall penetrations, louvers, fans and the like. <br /> <br />B. Locations indicated on Drawings including open joints around interior face of door and <br />window frames and where required to make joints weather-tight. <br /> <br />3.5 CLEANING <br /> <br />A. Clean adjacent surfaces free of sealant, caulking and soiling using solvents or cleaning <br />agents recommended by sealant or caulking manufacturer and that will not damage the <br />surface being cleaned. <br />
The URL can be used to link to this page
Your browser does not support the video tag.