My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Attachment C - Biddding Specification 1-23-25
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(25-01-01) City Annex Building Construction Renovations
>
INVITATION TO BID 25-01-01 CITY ANNEX BUILDING CONSTRUCTION RENOVATIONS
>
Attachment C - Biddding Specification 1-23-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2025 9:22:18 AM
Creation date
2/20/2025 9:18:50 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
City Annex Building Construction Renovations
Bid No. (xx-xx-xx)
25-01-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
960
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THE CITY OF SUNNY ISLES BEACH <br />PROJECT NO. 21-1011 <br />BUILDING DEPARTMENT RELOCATION TO ANNEX <br /> <br />Project No. 21-1011 November 2024 092423-5 <br /> <br />B. Product Data: <br /> <br />1. Manufacturer's specifications, details, installation instructions and product data. <br /> <br />2. Manufacturer's code compliance report and UL Listing for continuous insulation. <br /> <br />3. Manufacturer's code compliance report for air barrier and water-resistive barrier. <br /> <br />4. Manufacturer's NFPA 285 assembly report or ICC ESR indicating compliance of <br />stucco assembly, including continuous insulation, air/moisture barrier, and <br />drainage mat, with requirements of NFPA 285 for use on Types I, II, III, and IV <br />construction. <br /> <br />5. Manufacturer's code compliance report for stucco where ICC listed one coat <br />stucco is used. <br /> <br />6. Manufacturer's standard warranty. <br /> <br />7. Fastener manufacturer's pull-out or withdrawal capacity testing for frame <br />construction. <br /> <br />8. Preparation instructions and recommendations. <br /> <br />9. Storage and handling requirements and recommendations. <br /> <br />10. Typical installation methods. <br />C. Verification Samples: Two representative units of each type, size, pattern and color. <br />D. Shop Drawings: Include details of materials, construction and finish. Include relationship <br />with adjacent construction. <br />1.6 QUALITY ASSURANCE <br />A. Manufacturer Qualifications: <br /> <br />1. Stucco and air barrier products manufacturer for a minimum of 20 years. <br /> <br />2. Stucco finish products and air/moisture barrier products manufactured under ISO <br />9001 - Quality System, and 14001 - Environmental Management System. <br />B. Installer Qualifications: <br /> <br />1. Licensed, insured and engaged in application of Portland cement stucco for a <br />minimum of 3 years. <br /> <br />2. Knowledgeable in proper use and handling of Sto materials. <br /> <br />3. Employ skilled mechanics who are experienced and knowledgeable in Portland <br />cement stucco application, and familiar with the requirements of the specified <br />work. <br />
The URL can be used to link to this page
Your browser does not support the video tag.