Laserfiche WebLink
THE CITY OF SUNNY ISLES BEACH <br />PROJECT NO. 21-1011 <br />BUILDING DEPARTMENT RELOCATION TO ANNEX <br /> <br />Project No. 21-1011 November 2024 092423-6 <br /> <br /> <br />4. Successful completion of 3 projects of similar size and complexity to the specified <br />project. <br /> <br />5. Provide proper equipment, manpower and supervision on the job site to install <br />the system in compliance with Sto's published specifications and details and the <br />project plans and specifications. <br />C. Insulation Board Manufacturer Requirements: Listed by an approved agency. Label <br />insulation board with information required by Sto Corporation, approved listing agency, <br />and applicable building code. <br />D. Testing: <br /> <br />1. Construct full-scale mock-up of typical stucco/window wall assembly with <br />specified tools and materials and test air and water infiltration and structural <br />performance per ASTM E283, ASTM E331, and ASTM E330, respectively, through <br />an independent laboratory. <br /> <br />2. Mock-up shall comply with requirements of project specifications. <br /> <br />3. Where mock-up is tested at job site maintain approved mock-up at site as <br />reference standard. <br /> <br />4. If tested off-site accurately record construction detailing and sequencing of <br />approved mock-up for replication during construction. <br /> <br />5. Conduct air barrier adhesion testing per ASTM D4541. <br /> <br />6. Conduct air barrier assembly testing per ASTM E783. <br /> <br />7. Verify adequacy of pull-out or withdrawal capacity of fasteners used for frame <br />construction with manufacturer in relation to negative design wind pressures. <br />8. Conduct pH testing to check stucco surface alkalinity before application of primer <br />or finish materials. Where alkaline resistant primer is used pH testing may be <br />waived. <br />9. Conduct wet sealant adhesion testing in accordance with sealant manufacturer's <br />field quality control test procedure. <br />10. Notify design professional minimum 7 days prior to testing. <br />E. Inspections: <br /> <br />1. Independent third-party inspection where required by code or contract <br />documents. <br /> <br />2. Conduct inspections per code requirements and contract documents. <br />F. Source Limitations: Provide each type of product from a single manufacturing source to <br />ensure uniformity. <br />G. Mock-Up: Construct a mock-up with actual materials in sufficient time for Architect's <br />review and to not delay construction progress. Locate mock-up as acceptable to Architect <br />and provide temporary foundations and support.