My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Attachment C - Biddding Specification 1-23-25
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(25-01-01) City Annex Building Construction Renovations
>
INVITATION TO BID 25-01-01 CITY ANNEX BUILDING CONSTRUCTION RENOVATIONS
>
Attachment C - Biddding Specification 1-23-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2025 9:22:18 AM
Creation date
2/20/2025 9:18:50 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
City Annex Building Construction Renovations
Bid No. (xx-xx-xx)
25-01-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
960
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THE CITY OF SUNNY ISLES BEACH <br />PROJECT NO. 21-1011 <br />BUILDING DEPARTMENT RELOCATION TO ANNEX <br /> <br />Project No. 21-1011 November 2024 092423-31 <br /> <br />G. Scratch Coat: Apply approximate 3/8-inch (9 mm) scratch coat of Sto ExtraSeal by spray or <br />trowel any time after the skim coat application is dry. Scratch the surface horizontally with a <br />stucco rake tool. Moist cure the scratch coat during hot or extremely dry weather conditions. <br />H. Brown Coat: Allow scratch coat to dry minimum 24 hours and install stucco brown coat in <br />accordance with applicable codes and manufacturer's requirements. Limit total thickness, <br />including Sto ExtraSeal skim coat and scratch coat, stucco brown coat, and allowance for <br />finish coat, to 5/8 inches (16 mm) maximum. <br />I. Crack Defense: <br />1. Apply base coat over moist cured stucco brown coat with spray equipment or <br />stainless-steel trowel to a uniform thickness of approximately 1/8 inch (3 mm). <br />2. Work horizontally or vertically in strips of 40 inches (1016 mm), and immediately <br />embed mesh into wet base coat by troweling from center to edge of the mesh. <br />3. Overlap mesh 2-1/2 inches (64 mm) at mesh seams and at overlaps of detail mesh. <br />4. Feather seams and edges. Avoid wrinkles in the mesh. The mesh must be fully <br />embedded so no mesh color shows through the base coat when it is dry. <br />5. Re-skim with additional base coat if mesh color is visible. <br />6. Do not install base coat or mesh over joints or accessories in stucco wall assembly. <br />3.12 Primer Installation: Moist cure stucco brown coat for a minimum of 48 hours. <br />1. StoPrime Hot: Allow stucco to dry an additional 48 hours. Apply primer evenly with <br />brush, roller or proper spray equipment over the clean, dry stucco, and allow to dry. <br />Age of stucco must be minimum 7 days before application of finish. <br />2. StoPrime Sand: Wait until stucco is 28 days old or the pH level of the surface is below <br />10 before applying primer. Age of stucco must be minimum 28 days before <br />application of finish or pH must be below 10. <br />3. StoPrime: Wait until stucco is 28 days old or the pH level of the surface is below 10 <br />before applying primer. Age of stucco must be minimum 28 days before application of <br />finish or pH must be below 10. <br />B. Finish Installation: <br />1. Apply finish to primed stucco and foam build-outs when dry. <br />a. Apply finish by spraying or troweling with a stainless-steel trowel, depending on <br />the finish specified. <br />b. Follow these general rules for application of finish: <br />2. Allow 28-day stucco age or check for pH less than 10 before applying finish. If <br />StoPrime Hot is used, allow minimum 7-day age of stucco. <br />3. Avoid application in direct sunlight. <br />4. Apply finish in a continuous application, and work a wet edge towards the unfinished <br />wall area. Work to an architectural break in the wall before stopping to avoid cold <br />joints. <br />5. Weather conditions affect application and drying time. <br />a. Hot or dry conditions limit working time and accelerate drying. <br />b. Adjustments in the scheduling of work may be required to achieve desired <br />results; cool or damp conditions extend working time and retard drying and <br />may require added measures of protection against wind, dust, dirt, rain and <br />freezing. <br />c. Adjust work schedule and provide protection. <br />6. Float "R" (rilled or swirl texture) finishes with a plastic float to achieve their rilled <br />texture. <br />7. Do not install separate batches of finish side-by-side. <br />8. Do not apply finish into or over sealant joints or joint accessories. Apply finish to
The URL can be used to link to this page
Your browser does not support the video tag.