Laserfiche WebLink
THE CITY OF SUNNY ISLES BEACH <br />PROJECT NO. 21-1011 <br />BUILDING DEPARTMENT RELOCATION TO ANNEX <br /> <br />Project No. 21-1011 November 2024 092423-32 <br /> <br />outside face of wall only. <br />9. Do not apply finish over irregular, high pH, or unprepared surfaces, or surfaces not in <br />compliance with the requirements of the project specifications. <br />3.13 FIELD QUALITY CONTROL <br />A. Field Inspection: Coordinate field inspection in accordance with appropriate sections in <br />Division 01. <br />B. Manufacturer's Services: Coordinate manufacturer's services in accordance with appropriate <br />sections in Division 01. <br />C. Owner's qualified testing agency or building envelope consultant shall perform inspections <br />and tests. <br />D. Inspections: Air barrier materials are subject to inspection to verify compliance with <br />requirements. <br />1. Condition of substrates and substrate preparation. <br />2. Installation of primary air barrier material, accessory materials, and compatible <br />auxiliary materials over structurally sound substrates and in conformance with <br />architectural design details, contractor's shop drawings, project mock-up, and <br />manufacturer's written installation instructions. <br />3. Air barrier continuity and connections without gaps and holes at foundation, floor <br />lines, flashings, lintels and shelf angles, openings and penetrations such as pipes, <br />vents, windows and doors, masonry anchors, rafters or beams, joints in construction, <br />projections such as decks and balconies, and roof line. <br />E. Tests: Air barrier materials and assembly are subject to tests to verify compliance with <br />performance requirements: <br />1. Qualitative air leakage test: ASTM E 1186 <br />2. Quantitative air leakage test: ASTM E 779, ASTM E 783, and ASTM E 1827 <br />3. Adhesion test: ASTM D 4541 <br />4. Qualitative adhesion and compatibility testing: wet sealant manufacturer's field quality <br />control adhesion test <br />F. Repair non-conforming substrates and air barrier material installation to conform with <br />project requirements. <br />G. Take corrective action to repair and replace, or reinstall materials, seal openings, gaps, or <br />other sources of air leakage to conform with project performance requirements. <br />3.14 PROTECTION <br />A. Protect installed materials from water infiltration into or behind them. <br />B. Protect installed stucco from dust, dirt, precipitation, and freezing. <br />C. Protect installed primer and finish from dust, dirt, precipitation, freezing and continuous high <br />humidity until fully dry. <br />D. Sealant and backer material at stucco terminations and at fixture penetrations through the <br />stucco to protect against air, water and insect infiltration. <br />E. Weeps at floor lines, window and door heads, and other areas to conduct water to exterior.