My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Attachment C - Biddding Specification 1-23-25
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(25-01-01) City Annex Building Construction Renovations
>
INVITATION TO BID 25-01-01 CITY ANNEX BUILDING CONSTRUCTION RENOVATIONS
>
Attachment C - Biddding Specification 1-23-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2025 9:22:18 AM
Creation date
2/20/2025 9:18:50 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
City Annex Building Construction Renovations
Bid No. (xx-xx-xx)
25-01-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
960
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THE CITY OF SUNNY ISLES BEACH <br />PROJECT NO. 21-1011 <br />BUILDING DEPARTMENT RELOCATION TO ANNEX <br /> <br />Project No. 21-1011 November 2024 092423-32 <br /> <br />outside face of wall only. <br />9. Do not apply finish over irregular, high pH, or unprepared surfaces, or surfaces not in <br />compliance with the requirements of the project specifications. <br />3.13 FIELD QUALITY CONTROL <br />A. Field Inspection: Coordinate field inspection in accordance with appropriate sections in <br />Division 01. <br />B. Manufacturer's Services: Coordinate manufacturer's services in accordance with appropriate <br />sections in Division 01. <br />C. Owner's qualified testing agency or building envelope consultant shall perform inspections <br />and tests. <br />D. Inspections: Air barrier materials are subject to inspection to verify compliance with <br />requirements. <br />1. Condition of substrates and substrate preparation. <br />2. Installation of primary air barrier material, accessory materials, and compatible <br />auxiliary materials over structurally sound substrates and in conformance with <br />architectural design details, contractor's shop drawings, project mock-up, and <br />manufacturer's written installation instructions. <br />3. Air barrier continuity and connections without gaps and holes at foundation, floor <br />lines, flashings, lintels and shelf angles, openings and penetrations such as pipes, <br />vents, windows and doors, masonry anchors, rafters or beams, joints in construction, <br />projections such as decks and balconies, and roof line. <br />E. Tests: Air barrier materials and assembly are subject to tests to verify compliance with <br />performance requirements: <br />1. Qualitative air leakage test: ASTM E 1186 <br />2. Quantitative air leakage test: ASTM E 779, ASTM E 783, and ASTM E 1827 <br />3. Adhesion test: ASTM D 4541 <br />4. Qualitative adhesion and compatibility testing: wet sealant manufacturer's field quality <br />control adhesion test <br />F. Repair non-conforming substrates and air barrier material installation to conform with <br />project requirements. <br />G. Take corrective action to repair and replace, or reinstall materials, seal openings, gaps, or <br />other sources of air leakage to conform with project performance requirements. <br />3.14 PROTECTION <br />A. Protect installed materials from water infiltration into or behind them. <br />B. Protect installed stucco from dust, dirt, precipitation, and freezing. <br />C. Protect installed primer and finish from dust, dirt, precipitation, freezing and continuous high <br />humidity until fully dry. <br />D. Sealant and backer material at stucco terminations and at fixture penetrations through the <br />stucco to protect against air, water and insect infiltration. <br />E. Weeps at floor lines, window and door heads, and other areas to conduct water to exterior.
The URL can be used to link to this page
Your browser does not support the video tag.