Laserfiche WebLink
THE CITY OF SUNNY ISLES BEACH <br />PROJECT NO. 21-1011 <br />BUILDING DEPARTMENT RELOCATION TO ANNEX <br /> <br />Project No. 21-1011 November 2024 092900-7 <br /> <br />3.3 FINISHING OF DRYWALL <br /> <br />A. Apply joint treatment at gypsum board joints (both directions); flanges of corner bead, <br />edge trim, and control joints; penetrations; fastener heads, surface defects and elsewhere <br />as required to prepare work for decoration. <br /> <br />B. Prefill open joints and rounded or beveled edges, if any, using setting-type joint compound. <br /> <br />C. Apply joint tape at joints between gypsum boards, except where trim accessories are <br />indicated. <br /> <br />D. Finish interior gypsum wallboard by applying the joint compound in 3 coats (not including <br />prefill of openings in base), and sand between coats and after last coat. <br /> <br />E. Finishing Fasteners: <br /> <br />1. Apply a taping or all-purpose type compound to fastener depressions as the first <br />coat. <br /> <br />2. Follow with minimum of 2 additional coats of topping compound, leaving <br />depressions level with plane of surface. <br /> <br />3.4 PROTECTION <br /> <br />A. Provide final protection and maintain conditions, which ensure gypsum drywall construction <br />being without damage or deterioration at time of Substantial Completion. <br /> <br /> <br />END OF SECTION