My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Attachment C - Biddding Specification 1-23-25
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(25-01-01) City Annex Building Construction Renovations
>
INVITATION TO BID 25-01-01 CITY ANNEX BUILDING CONSTRUCTION RENOVATIONS
>
Attachment C - Biddding Specification 1-23-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2025 9:22:18 AM
Creation date
2/20/2025 9:18:50 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
City Annex Building Construction Renovations
Bid No. (xx-xx-xx)
25-01-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
960
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THE CITY OF SUNNY ISLES BEACH <br />PROJECT NO. 21-1011 <br />BUILDING DEPARTMENT RELOCATION TO ANNEX <br /> <br />Project No. 21-1011 November 2024 092900-7 <br /> <br />3.3 FINISHING OF DRYWALL <br /> <br />A. Apply joint treatment at gypsum board joints (both directions); flanges of corner bead, <br />edge trim, and control joints; penetrations; fastener heads, surface defects and elsewhere <br />as required to prepare work for decoration. <br /> <br />B. Prefill open joints and rounded or beveled edges, if any, using setting-type joint compound. <br /> <br />C. Apply joint tape at joints between gypsum boards, except where trim accessories are <br />indicated. <br /> <br />D. Finish interior gypsum wallboard by applying the joint compound in 3 coats (not including <br />prefill of openings in base), and sand between coats and after last coat. <br /> <br />E. Finishing Fasteners: <br /> <br />1. Apply a taping or all-purpose type compound to fastener depressions as the first <br />coat. <br /> <br />2. Follow with minimum of 2 additional coats of topping compound, leaving <br />depressions level with plane of surface. <br /> <br />3.4 PROTECTION <br /> <br />A. Provide final protection and maintain conditions, which ensure gypsum drywall construction <br />being without damage or deterioration at time of Substantial Completion. <br /> <br /> <br />END OF SECTION
The URL can be used to link to this page
Your browser does not support the video tag.