Laserfiche WebLink
THE CITY OF SUNNY ISLES BEACH <br />PROJECT NO. 21-1011 <br />BUILDING DEPARTMENT RELOCATION TO ANNEX <br /> <br /> <br /> <br />Project No. 21-1011 November 2024 017800 CLOSEOUT SUBMITTALS-2 <br /> <br />b. Bind Close-Out documents in heavy-duty, commercial quality 3-ring vinyl <br />covered loose-leaf binders <br />c. Include a table of contents and heavy paper divers, tabbed and <br />coordinated with table of contents, identifying each submitted item. <br /> <br />2. As-built drawings and other project record Documents: As specified in Section <br />01720. <br /> <br />3. Operating and Maintenance Data, Instructions to Owners Personnel: As specified <br />and in accordance with the requirements of the individual Sections of the <br />Specifications. <br /> <br />4. Warranties and Bonds: As specified in Section 01740 and in accordance with the <br />requirements of the individual Sections of the Specifications. <br /> <br />5. Spare parts and Maintenance Materials: To requirements of various Sections. <br /> <br />6. Evidence of Payment to subcontractors, material men and equipment suppliers <br />and releases of liens. <br /> <br />PART 2 - PRODUCTS <br /> <br />2.1 PRODUCTS: <br /> <br />A. No products are required except as indicated in PART 1: GENERAL. <br /> <br />PART 3 - EXECUTION <br /> <br />3.1 ATTACHMENTS <br /> <br />A. Attachment 15 Dated March 01, 2005, Substantial Completion Inspection <br /> <br />B. Attachment 16 Dated March 01, 2005, Request for Substantial Completion <br />Inspection <br /> <br />C. Attachment 17 Dated March 01, 2005, Punch List <br /> <br />PART 4 - MEASUREMENT AND PAYMENT <br /> <br />4.1 Full compensation for conforming to the requirements of this Section, CONTRACT CLOSEOUT <br />including all labor, materials, equipment, tools, and incidentals will be considered included in the <br />Contract Lump Sum Price listed in the Bid Form and no additional compensation will be allowed <br />therefore. <br /> <br /> <br /> <br />END OF SECTION