My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Attachment C - Biddding Specification 1-23-25
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(25-01-01) City Annex Building Construction Renovations
>
INVITATION TO BID 25-01-01 CITY ANNEX BUILDING CONSTRUCTION RENOVATIONS
>
Attachment C - Biddding Specification 1-23-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2025 9:22:18 AM
Creation date
2/20/2025 9:18:50 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
City Annex Building Construction Renovations
Bid No. (xx-xx-xx)
25-01-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
960
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THE CITY OF SUNNY ISLES BEACH <br />PROJECT NO. 21-1011 <br />BUILDING DEPARTMENT RELOCATION TO ANNEX <br /> <br /> <br /> <br />Project No. 21-1011 November 2024 017800 CLOSEOUT SUBMITTALS-1 <br /> <br /> <br />SECTION 017800 <br />CLOSEOUT SUBMITTALS <br /> <br />PART 1 - GENERAL <br /> <br />1.1 SUBSTANTIAL COMPLETION <br /> <br />A. Substantial Completion shall be determined in accordance with Paragraph 2.38, <br />SUBSTANTIAL COMPLETION, PUNCH LIST, and FINAL ACCEPTANCE of the Special <br />Conditions and this Section. Should a conflict arise between the Special Conditions and <br />this Section, the Special Conditions shall take precedence. See Attachments 15, 16, and <br />17. <br /> <br />1.2 FINAL CONSTRUCTION REVIEW <br /> <br />A. When Contractor considers work is complete, he shall submit a written certification that <br />work is acceptable and that: <br /> <br />1. Contract Documents have been reviewed. <br /> <br />2. Work has been reviewed for compliance with Contract Documents. <br /> <br />3. Work has been completed in accordance with Contract Documents. <br /> <br />4. Equipment and systems have been tested in the presence of the <br />Architect/Engineer on Record and are operational. <br /> <br />5. Work is completed and ready for final Construction Review. <br /> <br />B. The Architect/Engineer will make a Construction Review to verify status of completion <br />with reasonable promptness after receipt of such certification. <br /> <br />C. Failure of the Architect/Engineer of Record to Reject Work During Construction: If, during <br />construction operations or during inspections for substantial or final completion, the <br />Architect/Engineer should fail to reject defective Work or materials, whether from lack of <br />discovery of such defect or for any other reason, such initial failure to reject shall in no <br />way prevent his later rejection when such defect is discovered, or obligate the Owner to <br />final acceptance, and the Contractor shall make no claim for losses suffered due to any <br />necessary removals or repairs of such defects. <br /> <br />1.3 CONTRACTOR'S CLOSE-OUT SUBMITTALS <br /> <br />A. Upon receipt of notice of acceptability from the Engineer, the Contractor shall furnish <br />evidence of compliance with requirements of governing authorities and Contract <br />Documents to the Architect/Engineer of Record, as follows: <br /> <br />1. Close-Out documents <br /> <br />a. Submit three sets
The URL can be used to link to this page
Your browser does not support the video tag.