My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Attachment C - Biddding Specification 1-23-25
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(25-01-01) City Annex Building Construction Renovations
>
INVITATION TO BID 25-01-01 CITY ANNEX BUILDING CONSTRUCTION RENOVATIONS
>
Attachment C - Biddding Specification 1-23-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2025 9:22:18 AM
Creation date
2/20/2025 9:18:50 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
City Annex Building Construction Renovations
Bid No. (xx-xx-xx)
25-01-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
960
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />THE CITY OF SUNNY ISLES BEACH <br />PROJECT NO. 21-1011 <br />BUILDING DEPARTMENT RELOCATION TO ANNEX <br /> <br /> <br />Project No. 21-1011 November 2024 019113 Commisioning General <br />Requirements-7 <br />report and a Statement of Correction on the original non-compliance report. <br /> <br />3.2 CONTROLS CHECKOUT <br /> <br />A. Contractor shall notify CxA of controls check-out procedures 7 days prior to work <br />being performed at completion of controls checkout, Contractor shall provide CxA with <br />any checklists and/or summary reports. <br /> <br />3.3 TAB <br /> <br />A. TAB shall be performed after controls check-ouy has been approved by the CxA. <br /> <br />B. Contractor shall notify CxA of TAB 7 days prior to the work being performed at the <br />completion of TAB. Contractor shall provide CxA wih the TAB report. <br /> <br />3.4 FUNCTIONAL PERFORMANCE TESTING <br /> <br />A. Contractor shall schedule and execute the functional tests. Functional testing is <br />conducted after TAB has been completed and approved by CxA. <br /> <br />3.5 TRAINING OF PERSONEL <br /> <br />A. Contractor shall schedule and conduct training of Owner designated personnel. <br /> <br />B. Contractor shall record training sessions on video and provide in format acceptable to <br />CxA. <br /> <br /> <br />3.6 DEFERRED TESTING <br /> <br />A. Contractor shall provide pre-functional checkout, controls checkout, TAB, functional <br />performance testing and training of personnel for any tests deferred due to reasons <br />of building structure, required occupancy conditions or other deficiency determined <br />by the CxA. These tests shall be conducted in the same manner as non-deferred <br />activities. <br /> <br /> <br /> <br />END OF SECTION
The URL can be used to link to this page
Your browser does not support the video tag.