My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Attachment C - Biddding Specification 1-23-25
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(25-01-01) City Annex Building Construction Renovations
>
INVITATION TO BID 25-01-01 CITY ANNEX BUILDING CONSTRUCTION RENOVATIONS
>
Attachment C - Biddding Specification 1-23-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2025 9:22:18 AM
Creation date
2/20/2025 9:18:50 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
City Annex Building Construction Renovations
Bid No. (xx-xx-xx)
25-01-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
960
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THE CITY OF SUNNY ISLES BEACH <br />PROJECT NO. 21-1011 <br />BUILDING DEPARTMENT RELOCATION TO ANNEX <br /> <br />Project No. 21-1011 November 2024 022200 Existing Conditions <br />Assessment-1 <br />SECTION 22200 <br />EXISTING SITE CONDITIONS ASSESSMENT <br /> <br />PART 1 - GENERAL <br /> <br />1.1 STIPULATIONS <br /> <br />A. Related Specifications Sections: <br /> <br />1. Division 01 Remove, Store and Reinstall Existing Facilities <br />2. Division 01 Construction and Demolition Waste Management <br />3. Division 02 Selective Site Building Demolition <br />4. Division 07 Polyisocyanurate Roof Insulation <br />5. Division 07 Low Slope Roofing Cover Board <br />6. Division 07 Ethylene, Propylene, Diene, Monomer (EPDM) <br />Membrane Roofing <br />7. Division 07 Flashing and Trim Accessories <br /> <br />B. Definitions: <br /> <br />1. Components: The physical facilities herein the Contractor plans to remove, <br />store or reinstall, as described in the Contract Documents. <br /> <br />2. Contract Documents: The documents consisting of the Form of Agreement <br />between Baden Borough and Contractor, Conditions of the Contract, (General, <br />Supplementary, and other Conditions), Drawings, Specifications and all <br />Addenda issued prior to the execution of the contract. <br /> <br />3. Contract Drawings: The drawings that form a part of the Contract Documents <br />that provides the graphical representation of the project requirements <br />intended design and/or performance criteria to be delivered by the Contractor. <br /> <br />4. Existing to Remain: Protect existing facilities and installations indicated to <br />remain against damage and soiling during selective demolition. <br /> <br />5. Remove: Remove and dispose of items except those indicated to be <br />reinstalled, salvaged, or to remain the property of the owner. <br /> <br />6. Remove and Reinstall: Remove and salvage items indicated; clean, service <br />and otherwise prepare them for use; store and protect against damage; tag <br />or otherwise identify in preparation for reinstallation in the same locations or <br />as directed. <br /> <br />7. Working Drawings: A drawing and/or set of drawings produced by the <br />Contractor providing specific information related to the removal, storage and <br />reinstallation of related appurtenances, components, facilities, hardware, <br />products and/or systems. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.