Laserfiche WebLink
City of Sunny Isles Beach 18070 Collins Avenue, Sunny Isles Beach, Florida 33160 <br />(305) 947-0606 phone (305) 949-3113 Fax <br />and further agrees to execute, if requested by the City, separate assignments of warranty <br />on a form furnished by the City. <br />7.6 In the event permits are required, the Contractor shall obtain, and the City shall pay <br />for, all permits, fees, and licenses necessary and ordinary for the Work except as otherwise <br />provided in this Contract. <br />The Contractor shall comply with all lawful requirements applicable to the Work and shall give and <br />maintain any and all notices required by applicable law pertaining to the Work. <br />7.7 Supervision <br />7.7.1 The Contractor shall employ and maintain at the Project site only competent <br />supervisory personnel. Absent written instruction from the Contractor to the contrary, <br />the superintendent shall be deemed the Contractor's authorized representative at the site <br />and shall be authorized to receive and accept any and all communications from the City <br />or the City's Representative. <br />7.7.2 Key administrative, managerial and supervisory personnel assigned by the <br />Contractor to this Project are as follows: <br />Name <br />Function <br />Jose L. Sierra Project ,Manager / Principal in Charge <br />Project Superintendent <br />The Contractor shall furnish to the City complete resumes of each of the individuals <br />named above. So long as the individuals named above remain actively employed or <br />retained by the Contractor, they shall perform the functions indicated next to their names <br />unless the City agrees to the contrary in writing or unless the City requests the removal of <br />any such individual from the Project. In the event the City requests the removal of any of <br />the individuals named above, the Contractor shall immediately comply and shall <br />immediately replace such individual with a qualified substitute to whom the City makes <br />no objection. In the event one or more individuals not listed above subsequently <br />assumes one or more of those functions listed above, the Contractor shall be bound by <br />the provisions of this Subparagraph 7.7.2 as though such individuals had been listed above. <br />7.8 Prior to the commencement of any construction activity, the Contractor shall <br />provide to the City the layout, right of way designation, and work area parameters for the Work. <br />7.9 The Contractor, within fifteen (15) days of commencing the Work, shall submit to the <br />City and the City's Representative for their information, the Contractor's schedule for <br />completing the Work. The Contractor's schedule shall be presented in the critical path (CPM) <br />format. The Contractor's schedule shall be revised no less frequently than monthly (unless the <br />parties otherwise agree in writing) and shall be revised to reflect conditions encountered from time <br />to time and shall be related to the entire Project. Each such revision shall be furnished to the <br />City and the City's Representative with each Application for Payment. Failure by the Contractor <br />COMTECH ENGINEERING, INC. 16 <br />