My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2025-3779
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2025
>
Reso 2025-3779
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2025 4:13:12 PM
Creation date
2/24/2025 4:03:15 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2025-3779
Date (mm/dd/yyyy)
01/16/2025
Description
Approving an Agreement with Comtech Engineering, Inc., for the Golden Shores Pump Station Rehabilitation Project.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Sunny Isles Beach 18070 Collins Avenue, Sunny Isles Beach, Florida 33160 <br />(305) 947-0606 phone (305) 949-3113 Fax <br />to strictly comply with the provisions of this Paragraph 7.9 shall constitute a material breach of <br />this Contract. <br />7.10 The Contractor shall continuously maintain at the site, in an orderly fashion and <br />format acceptable to the City, for the benefit of the City and the City's Representative one record <br />copy of this Contract and all Contract Documents marked to record on a current basis changes, <br />selections and modifications made during construction. Additionally, the Contractor shall <br />maintain at the site for the City and the City's Representative the approved Shop Drawings, <br />Product Data, Samples, As -Builds and other similar required submittals. Upon final completion <br />of the Work, all of these record documents shall be delivered to the City. <br />7.10.1 No less than bi-weekly, the Contractor shall conduct a Project meeting <br />which shall include the Contractor's administrative, managerial, and supervisory personnel <br />and representatives of each subcontractor working on the Project site. The meeting shall <br />address, but shall not be limited to, the current status of the Work, including the current <br />Project schedule and the existence of any defective or deficient work as well as the <br />appropriate action required to correct or replace such work. The City and the City's <br />Representative shall have the right, but not the duty, to attend such weekly meetings. The <br />Contractor shall maintain detailed minutes of each such weekly meetings and shall <br />distribute typewritten copies of such minutes to the City and the City's Representative no <br />later than the close of the next workday following completion of such meeting. The <br />Contractor shall further require its Project Manager to maintain a daily job diary which <br />shall include for each work day the daily weather conditions, the identity of each <br />subcontractor working on the site, the manpower of each subcontractor working on the <br />site, the identity of all visitors to the Project site, documentary progress photographs, and <br />any and all other information reflecting any delays, hindrances, interferences, or other <br />problems encountered or incurred on the Project site. Each week the Contractor shall <br />furnish the City and the City's Representative on a weekly basis full and complete copies <br />of said daily job diary. <br />7.11 Shop Drawings, Product Data and Samples <br />7.11.1 Shop Drawings, Product Data, Samples, and other submittals from the <br />Contractor do not constitute Contract Documents. Their purpose is merely to demonstrate <br />the manner in which the Contractor intends to implement the Work in conformance.with <br />information received from the Contract Documents. <br />7.11.2 The Contractor shall not perform any portion of the Work requiring submittal <br />and review of Shop Drawings, Product Data, or Samples unless and until such submittals <br />have been approved by the City's Representative. Approval by the City's <br />Representative, however, shall not be evidence that Work installed pursuant thereto <br />conforms with the requirements of this Contract. <br />7.11.3 The Contractor shall maintain a log of all Shop Drawings, Product Data, and <br />Samples submitted to the City's Representative and the City including, but not limited <br />to, identification of the item of work according to appropriate specification section; date of <br />receipt from appropriate subcontractor or supplier; date of review by the <br />Contractor; date of submission to the City's Representative; date of return from the <br />CON TECH ENGINEERING, INC. 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.