City of Sunny Isles Beach 18070 Collins Avenue, Sunny Isles Beach, Florida 33160 <br />(305) 947-0606 phone (305) 949-3113 Fax <br />to strictly comply with the provisions of this Paragraph 7.9 shall constitute a material breach of <br />this Contract. <br />7.10 The Contractor shall continuously maintain at the site, in an orderly fashion and <br />format acceptable to the City, for the benefit of the City and the City's Representative one record <br />copy of this Contract and all Contract Documents marked to record on a current basis changes, <br />selections and modifications made during construction. Additionally, the Contractor shall <br />maintain at the site for the City and the City's Representative the approved Shop Drawings, <br />Product Data, Samples, As -Builds and other similar required submittals. Upon final completion <br />of the Work, all of these record documents shall be delivered to the City. <br />7.10.1 No less than bi-weekly, the Contractor shall conduct a Project meeting <br />which shall include the Contractor's administrative, managerial, and supervisory personnel <br />and representatives of each subcontractor working on the Project site. The meeting shall <br />address, but shall not be limited to, the current status of the Work, including the current <br />Project schedule and the existence of any defective or deficient work as well as the <br />appropriate action required to correct or replace such work. The City and the City's <br />Representative shall have the right, but not the duty, to attend such weekly meetings. The <br />Contractor shall maintain detailed minutes of each such weekly meetings and shall <br />distribute typewritten copies of such minutes to the City and the City's Representative no <br />later than the close of the next workday following completion of such meeting. The <br />Contractor shall further require its Project Manager to maintain a daily job diary which <br />shall include for each work day the daily weather conditions, the identity of each <br />subcontractor working on the site, the manpower of each subcontractor working on the <br />site, the identity of all visitors to the Project site, documentary progress photographs, and <br />any and all other information reflecting any delays, hindrances, interferences, or other <br />problems encountered or incurred on the Project site. Each week the Contractor shall <br />furnish the City and the City's Representative on a weekly basis full and complete copies <br />of said daily job diary. <br />7.11 Shop Drawings, Product Data and Samples <br />7.11.1 Shop Drawings, Product Data, Samples, and other submittals from the <br />Contractor do not constitute Contract Documents. Their purpose is merely to demonstrate <br />the manner in which the Contractor intends to implement the Work in conformance.with <br />information received from the Contract Documents. <br />7.11.2 The Contractor shall not perform any portion of the Work requiring submittal <br />and review of Shop Drawings, Product Data, or Samples unless and until such submittals <br />have been approved by the City's Representative. Approval by the City's <br />Representative, however, shall not be evidence that Work installed pursuant thereto <br />conforms with the requirements of this Contract. <br />7.11.3 The Contractor shall maintain a log of all Shop Drawings, Product Data, and <br />Samples submitted to the City's Representative and the City including, but not limited <br />to, identification of the item of work according to appropriate specification section; date of <br />receipt from appropriate subcontractor or supplier; date of review by the <br />Contractor; date of submission to the City's Representative; date of return from the <br />CON TECH ENGINEERING, INC. 17 <br />