My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Addendum # 1 City of Sunny Isles Response-RFI Sheet
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(25-01-01) City Annex Building Construction Renovations
>
Addendum # 1 City of Sunny Isles Response-RFI Sheet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2025 12:55:54 PM
Creation date
3/10/2025 12:51:21 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
196
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THE CITY OF SUNNY ISLES BEACH <br />PROJECT NO. 21-1011 <br />BUILDING DEPARTMENT RELOCATION TO ANNEX <br /> <br />Project No. 21-1011 November 2024 02510-3 <br /> <br />b. Cut a groove in the fresh concrete to a depth of at one quarter the section thickness by <br />use of a jointer having a radius of one half inch and thickness not exceeding one half <br />inch. <br />c. Saw the hardened concrete before shrinkage cracking occurs. Depth of cut not less <br />than one quarter the section thickness and width of key not to exceed three sixteenths <br />inch. <br />B. Expansion Joints: <br />1. Construct at the following locations: <br />a. Locations as indicated. <br />b. All points of curvature and points of tangency of curves having a radius of 100 inches <br />or less and at intervals not exceeding 60 inches in tangent section. <br />c. Locations where curb abuts other structures and slabs. <br />2. Stake, support, and secure preformed joint filler in position to prevent displacement during <br />and finishing operations. <br />3. Round edges of joints with an edging tool of one quarter inch radius. <br />C. Construction Joints: <br />1. Locate to coincide with contraction, expansion or key joints. <br />2. When concrete placement is interrupted between joint locations for a sufficient time for the <br />concrete to take its initial set, remove concrete to the nearest joint location before resuming <br />placement. <br /> <br />END OF SECTION <br />
The URL can be used to link to this page
Your browser does not support the video tag.