My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Addendum # 1 City of Sunny Isles Response-RFI Sheet
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(25-01-01) City Annex Building Construction Renovations
>
Addendum # 1 City of Sunny Isles Response-RFI Sheet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2025 12:55:54 PM
Creation date
3/10/2025 12:51:21 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
196
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THE CITY OF SUNNY ISLES BEACH <br />PROJECT NO. 21-1011 <br />BUILDING DEPARTMENT RELOCATION TO ANNEX <br /> <br />Project No. 21-1011 November 2024 096513 Resilient Base and Accessories -3 <br />C. Tightly adhere wall base to substrate throughout length of each piece, with base in <br />continuous contact with horizontal and vertical substrates. D. Do not stretch wall base <br />during installation. <br />E. On masonry surfaces or other similar irregular substrates, fill voids along top edge of wall <br />base with manufacturer's recommended adhesive filler material. <br />F. Premolded Corners: Install premolded corners before installing straight pieces. <br />G. Job-Formed Corners: <br />1. Outside Corners: Use straight pieces of maximum lengths possible. Form without <br />producing discoloration (whitening) at bends. Shave back of base at points where <br />bends occur and remove strips perpendicular to length of base that <br />are only deep enough to produce a snug fit without removing more than half the <br />wall base thickness. <br /> <br />2. Inside Corners: Use straight pieces of maximum lengths possible. Form by cutting <br />an inverted V-shaped notch in toe of wall base at the point where corner is formed. <br />Shave back of base where necessary to produce a snug fit to substrate. <br /> <br />3.4 CLEANING AND PROTECTION <br /> <br />A. Perform the following operations immediately after completing resilient product <br />installation: <br /> <br />1. Remove adhesive and other blemishes from exposed surfaces. <br /> <br />2. Sweep and vacuum surfaces thoroughly. <br /> <br />3. Damp-mop surfaces to remove marks and soil. <br /> <br />a. Do not wash surfaces until after time period recommended by <br />manufacturer. <br /> <br />B. Protect resilient products from mars, marks, indentations, and other damage from <br />construction operations and placement of equipment and fixtures during remainder of <br />construction period. Use protection methods recommended in writing by manufacturer. <br /> <br /> <br />END OF SECTION
The URL can be used to link to this page
Your browser does not support the video tag.