My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Addendum # 1 City of Sunny Isles Response-RFI Sheet
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(25-01-01) City Annex Building Construction Renovations
>
Addendum # 1 City of Sunny Isles Response-RFI Sheet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2025 12:55:54 PM
Creation date
3/10/2025 12:51:21 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
196
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THE CITY OF SUNNY ISLES BEACH <br />PROJECT NO. 21-1011 <br />BUILDING DEPARTMENT RELOCATION TO ANNEX <br /> <br />Project No. 21-1011 November 2024 102641-1 <br /> <br />SECTION 102641 <br />TSS BR FIBERGLASS PANELS <br /> <br />PART 1 - GENERAL <br /> <br />1.1 SECTION INCLUDES <br /> <br />A. TSS Total Armor Bullet Resistant Fiberglass. <br /> <br />1.2 REFERENCES <br /> <br />A. Underwriters Laboratory UL 752-Standard for Bullet Resisting Equipment. <br /> <br />B. ASTM C 1172 - Standard Specification for Laminated Architectural Flat Glass. <br /> <br />C. ASTM E119-98-Standard Test Methods for Fire Tests of Building Construction and <br />Materials, <br /> <br />D. MIL-P-46593A-Numerical simulation of ballistic impact on composite laminates, <br /> <br />E. MIL-STD-622F-V50 Ballistic Test for Armor. <br /> <br />1.3 ACTION SUBMITTALS <br /> <br />A. Refer to Section [01 33 00 Submittal Procedures] <br /> <br />B. Product Data: Including manufacturer recommended installation instructions. <br /> <br />C. Shop Drawings: Include plans, elevations, sections, details, attachment to other work. <br /> <br />D. Samples: For each exposed glazing type. <br /> <br />1.4 INFORMATION SUBMITTALS <br /> <br />A. Product Test Reports: Indicating compliance with requirements <br /> <br />B. Warranty: Sample of warranty <br /> <br />1.5 CLOSEOUT SUBMITTALS <br /> <br />A. Refer to Section [01 78 00 Closeout Submittals] <br /> <br />B. Maintenance data. <br /> <br />1.6 DELIVERY, STORAGE AND HANDLING <br /> <br />A. Refer to Section [01 60 00 Product Requirements] <br /> <br />B. Deliver materials to the project site with the manufacturer’s UL Listed Labels intact and <br />legible. Handle the materials with care to prevent damage. Store materials inside and <br />under cover, stack flat and off floor. Project conditions (temperature, humidity, and <br />ventilation) shall be within the maximum limit recommendations provided by manufacturer. <br />Do not install products stored in conditions outside manufacturer’s recommended limits.
The URL can be used to link to this page
Your browser does not support the video tag.