My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ERNEST
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(25-01-01) City Annex Building Construction Renovations
>
Responses
>
ERNEST CONSTRUCTION FL INC
>
ERNEST
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2025 1:01:39 PM
Creation date
3/10/2025 12:59:28 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
141
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project Name: Universal Epic Universe <br /> Project Description: Supervised electrical installations for Universalʼs Epic Universe theme park, encompassing <br /> power distribution, lighting, and control systems across various attractions and facilities within the expansive <br /> park. Ensured adherence to safety standards and optimized energy efficiency to enhance guest experiences. <br /> Client / Developer: Universal Parks & Resorts <br /> Project Size: $17M <br /> Project Name: Mason Academy HVAC System Installation <br /> Project Description: Oversaw the installation of a high-efficiency HVAC system for Mason Academy, ensuring <br /> optimal climate control, air quality, and energy efficiency for the educational facility. The project included air <br /> distribution, ventilation, and temperature regulation systems to create a comfortable and sustainable learning <br /> environment. <br /> Client / Developer: Mason Academy <br /> Project Size: $4.6M <br /> Danny Diaz <br /> Senior Superintendent, Plumbing <br /> Danny Diaz is a Senior Plumbing Superintendent with 25 years of experience managing complex plumbing <br /> projects across industries. His portfolio includes SpaceX, Walt Disney, Universal Studios, NASA, Coca-Cola, <br /> SeaWorld, UCF, Hard Rock Café, Hilton Hotels, and high-end projects in New York. Known for his expertise in <br /> large-scale installations, he ensures efficiency, safety, and quality while keeping projects on schedule and <br /> within budget. <br /> Project Name: SpaceX Facilities Plumbing Infrastructure <br /> Project Description: Led plumbing infrastructure projects across various SpaceX facilities, including a <br /> 53,000-square-foot refurbishment center at Port Canaveral, Florida, and a 521,000-square-foot Starlink <br /> equipment production facility in Bastrop County, Texas. Oversaw the installation and maintenance of complex <br /> piping systems, ensuring efficient water supply, drainage, and compliance with aerospace industry standards. <br /> Collaborated closely with engineering teams to support mission-critical operations. <br /> Client / Developer: SpaceX <br /> Project Size: $2.5M <br /> Project Name: Walt Disney Vacation Villas <br /> Project Description: Managed comprehensive plumbing renovations for Disney's Vacation Villas at the Disney <br /> Springs area. The project encompassed overhauling plumbing systems in multiple villas, including Grand Villas <br /> approximately 2,800 square feet in size, enhancing water efficiency and guest comfort. Responsibilities <br /> Ernest Energy Inc. ITB 250101 14 of 20
The URL can be used to link to this page
Your browser does not support the video tag.