My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ERNEST
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(25-01-01) City Annex Building Construction Renovations
>
Responses
>
ERNEST CONSTRUCTION FL INC
>
ERNEST
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2025 1:01:39 PM
Creation date
3/10/2025 12:59:28 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
141
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
included upgrading fixtures, pipelines, and integrating modern water conservation technologies. <br /> Client / Developer: Walt Disney <br /> Project Size: $1.6M <br /> Project Name: Universal Studios Park Upgrades <br /> Project Description: Supervised multiple plumbing projects within Universal Studios' theme park attractions. <br /> Projects ranged from $600K to $900K, focusing on installing and upgrading water distribution and drainage <br /> systems to support various rides and facilities. Ensured minimal disruption to park operations during <br /> installations and adherence to safety standards. <br /> Client / Developer: Universal Studios <br /> Project Size : $6M <br /> Project Name: NASA Facility Enhancement Project <br /> Project Description: Directed the installation and maintenance of high-precision plumbing systems at NASA <br /> facilities. Ensured all systems met stringent aerospace standards, supporting various research and operational <br /> needs. Collaborated with NASA engineers to design and implement solutions for specialized requirements. <br /> Client / Developer: NASA <br /> Project Size: Confidential <br /> Project Name: Coca-Cola Factory <br /> Project Description: Led plumbing infrastructure upgrades at a Coca-Cola manufacturing facility, improving <br /> water distribution, waste management, and production efficiency. <br /> Client / Developer: Coca-Cola Inc <br /> Project Size: $1.8M <br /> Project Name: Mason Academy <br /> Project Description: Led the complete plumbing system installation for Mason Academy in Collier County, <br /> Florida, ensuring high-quality infrastructure, water efficiency, and compliance with all industry standards. Work <br /> included water supply, drainage, and fixture installations to support a modern learning environment. <br /> Client / Developer: Mason Academy <br /> Project Size: $4.6M <br /> Project Name: SeaWorld Aquatic Systems Upgrade <br /> Project Description: Managed plumbing infrastructure enhancements at SeaWorld, focusing on water filtration <br /> and pipeline installations to support aquatic exhibits. Ensured the systems met environmental standards and <br /> provided optimal conditions for marine life. <br /> Client / Developer: SeaWorld Entertainment Inc. <br /> Ernest Energy Inc. ITB 250101 15 of 20
The URL can be used to link to this page
Your browser does not support the video tag.