My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
H.A. CONTRACTING CORP.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(25-01-01) City Annex Building Construction Renovations
>
Responses
>
H.A. CONTRACTING CORP
>
H.A. CONTRACTING CORP.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2025 1:08:36 PM
Creation date
3/10/2025 1:07:06 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
111
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Kristina McHugh <br />Project Manager, H. A. Contracting Corp. <br />With over 15 years of expertise in the Miami-Dade and Broward <br />construction landscape, Kristina McHugh stands out as a seasoned <br />Construction Project Manager, specializing in K-12 school projects <br />across South Florida. Her role encompasses meticulous project progress <br />monitoring, contract management, and the adept management of project <br />documentation and pay applications. Kristina’s profound understanding <br />of the unique challenges within educational facility construction is <br />evident in her track record. She navigates the complexities with finesse, <br />showcasing not only a mastery of project management methodologies but <br />also an ability to seamlessly handle regulatory and logistical intricacies <br />specific to K-12 school projects in the vibrant South Florida region.16 Years Experience <br />Palm Beach Community College <br />Park Springs Elementary School, Broward, FL <br />This project consists of renovations to the Art Lab and Music Room; fire alarm replacement, HVAC improvements <br />and building envelope improvements in all ten buildings. <br />Charles Drew FRC, Broward, FL <br />This project consists of site improvements, aluminum walkway repairs, re-roof and HVAC repairs/replacement in <br />twelve buildings on this campus. <br />Sanders Park Elementary, Broward, FL <br />This project consists of chiller replacement, fire alarm system replacement, window replacement, re-roof, HVAC <br />upgrades/replacement, media center renovations and installation of fire sprinklers. <br />Indian Trace, Broward, FL <br />This project consists of roof replacement, HVAC replacement, and painting of the exterior buildings in eight <br />buildings on this campus. <br />Coconut Creek High School, Broward, FL <br />This project consists of auditorium seating – ada compliance, fire alarm system replacement, stem lab <br />improvements and renovations to classrooms, media center and restroom improvements, mechanical <br />improvements, roof replacements, and fire protection relocation. <br />Country Hills Elementary School, Broward, FL <br />This project consists of fire sprinkler improvements, aluminum covered walkways replacement, roof replacement, <br />exterior stucco repair and repaint; mechanical upgrades in all buildings. <br />Cross Creek School, Broward, FL <br />This project consists of fire alarm replacement, exterior painting in six buildings, exterior chiller and HVAC <br />replacement including all components. <br />Millennium Academy, Broward, FL <br />This project consists of roof replacement, HVAC window upgrades and renovations to the music, art and band <br />rooms. <br />Similar Project Experience
The URL can be used to link to this page
Your browser does not support the video tag.