My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
H.A. CONTRACTING CORP.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(25-01-01) City Annex Building Construction Renovations
>
Responses
>
H.A. CONTRACTING CORP
>
H.A. CONTRACTING CORP.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2025 1:08:36 PM
Creation date
3/10/2025 1:07:06 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
111
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Peter Xiggoros <br />Superintendent, H. A. Contracting Corp. <br />Mr. Xiggoros has over 30 years of leading projects as a Superintendent. <br />His leadership combined with construction knowledge make him <br />an asset to the team. He has excellent communication skills and <br />will take responsibility for developing solutions to problems. Peter’s <br />role includes planning and implementing construction means and <br />methods, schedules, productivity innovations, and site logistics. <br />His on-site coordination of manpower, materials, and equipment <br />helps to ensure on-schedule construction, a high level of quality, <br />and safety for all personnel on the project site. <br />31 Years Experience <br />Technical School of Construction <br />30 Hour OSHA <br />40 Hour Site Safety Manager 32 <br />Hour Supported Scaffolding Track <br />safety certification <br />CPR Training <br />Country Hills Elementary School, Broward, FL <br />The Architect of record is Song & Associates. This project consists of Roof Replacements in buildings 1-6 <br />and 8-10. HVAC Replacements in buildings 1-6, 8-9 and 85 this included 5 AHU and 44 Fan Coils Units. <br />The interior work consisted of fire sprinkler system in building 2. <br />Millennium Academy, Broward, FL <br />The Architect of record is Song & Associates. This project consists of Roof Replacements in buildings 1-3. <br />HVAC Replacements in buildings 4 included 3 AHU’s, 1 Chiller and 18 VAV’s. The interior work consisted of <br />window replacements and a complete renovation to the Music, Art, Band and Ensemble rooms. <br />Piper HS SMART Renovations, Sunrise, FL <br />Campus wide HVAC Replacements including 31 roof top mounted AHU’s, 126 VAV’s removed and <br />replaced, and all controls upgrade for all new and existing equipment. <br />Lauderdale Lakes Middle School, Ft. Lauderdale, FL <br />Removed and replaced HVAC systems, roof, main switch gear, replaced stem labs and media center <br />renovations. <br />Hollywood Hills High School, Hollywood, FL <br />Media center renovated, Stem labs renovated, wood shop, renovated, main switch gear replaced, full roof <br />replacement <br />Sheridan Hills High School, Hollywood, FL <br />Upgraded the following: HVAC system, main switch gear, and electrical boxes. Full roof replacement, stem <br />lab and media center renovations. <br />Similar Project Experience
The URL can be used to link to this page
Your browser does not support the video tag.