Laserfiche WebLink
LUNFICO <br />Actual start and completion dates (month/year): 9130/2021-9/30/2022. Actual completion was <br />11130/2023. Seven (7) Modifications for the project included cost impacts and time extensions. <br />Hurricane Ian impacted the project on 28 September 2022. In addition, the project did incur supply <br />chain impacts from the COVID-19 pandemic. <br />Past performance reference/agency POC name, address, phone number and email of POC for <br />this project: Jose Blanco, Archhitect, blancoarchitectsfc�att._net, 305-205-1813 Thomas Pio, <br />Contracting Officer thomas.M.Pioi@uWs.JoY PH.: 336-665-2873 <br />Lunacon Engineering Group Corp dba. Lunacon Construction Group <br />ITB No. 25-01-01 City Annex Building Construction Renovations <br />Due Date: 05 March 2025, 4:30 PM <br />16 <br />