Laserfiche WebLink
LUNACO <br />Safety <br />Safety Experience Modification Ratio: For the 2023-2024 period, Lunacon's rate is 0.78. For the <br />2022-2023 period, the EMR was 0.79. For the 2021-2022 period, the EMR was 0.81. Lunacon <br />anticipates its EMR to continue to decrease. A copy of Lunacon's current Experience Modification <br />Rating EMR letter and OSHA 300a log are included with this proposal response. <br />Lunacon Engineering Group Corp dba. Lunacon Construction Group <br />ITB No. 25-01-01 City Annex Building Construction Renovations <br />Due Date: 05 March 2025,4:30 PM <br />46 <br />