Laserfiche WebLink
IAI <br />Ir <br />LuNRCOK <br />YOUR CONSTRUCTION PARTNER <br />Arrival On -Site (Within 2 Hours) <br />• The response team arrives within two hours to address the emergency. <br />• An initial assessment is performed, and emergency mitigation measures are implemented. <br />Resolution & Communication <br />• Immediate corrective actions are taken to secure the site. <br />• The City's project manager is updated on the response and corrective measures. <br />• A detailed incident report is provided within 24 hours of the emergency event. <br />Resources & Capabilities <br />• Emergency Equipment: Fully stocked response vehicles with essential tools and safety gear. <br />• Trained Personnel: Certified electricians, structural engineers, safety officers, and general <br />contractors available 24/7. <br />• Strategic Response Plan: Pre -established protocols for fire, flood, electrical hazards, structural <br />concerns, and security breaches. <br />Lunacon Engineering Group Corp dha. Lunacon Construction Group <br />ITB No. 25-01-01 City Annex Building Construction Renovations <br />Due Date: 05 March 2025, 4:30 PM <br />45 <br />