My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WAYPOINT CONTRACTING
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(25-01-01) City Annex Building Construction Renovations
>
Responses
>
WAYPOINT CONTRACTING
>
WAYPOINT CONTRACTING
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2025 1:22:33 PM
Creation date
3/10/2025 1:21:51 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Automation Pro 2017-2019 <br />Supervisor <br />•Responsible for multiple low voltage projects to ensure efficiency and minimize project cost and lost time. <br />•Designing and installation of structural wiring for commercial and residential buildings. <br />•Monitor performance on the field. <br />•Manage a crew of technicians to coordinate their weekly activities and tasks. <br />•Provide updates to owner regarding procurements, schedule and project progress. <br />•Completed Projects: <br />*LYFT Hub Offices ($300 K) - Low Voltage System – Miami, FL. <br />*Senior Livings ($100 K) – Security System Improvements – Wilton Manors, FL. <br />*The Estates at Acqualina (6 Units / $200-600 K each) – Smart House System – Sunny Isles, FL. <br />2014-2017Parque Industrialy Comerical del Este <br />Supervisor <br />• Supervised laborers during construction of shopping centers and industrial buildings, and ensured tasks were <br />being completed safely and on schedule. <br />•Scheduled weekly meetings to update management on progress and discuss issues or identify activities <br />requiring more attention. <br />Successfully delivered several projects with scopes related to Residential, Commercial, roadway, drainage and Traffic signal. <br />•Completed Projects: <br />*Residential Single Family (15 units / $350-400 K each) - Ground up single family homes – Ft. Lauderdale, FL. <br />*NW 74 St Traffic Signal Improvements ($1 M) – Doral, FL. <br />*West Regional Terminal Improvements ($700 K) – Broward County Transit. Plantation, FL. <br />*183rd Roadway Improvements ($1.5 M) – North Miami Beach, FL. <br />*Stormwater & Drainage renovations ($100K – 500K each) – Miami Gardens, FL. <br />Continental Construction USA Field <br />Superintendent 2019-2021
The URL can be used to link to this page
Your browser does not support the video tag.