My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WAYPOINT CONTRACTING
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(25-01-01) City Annex Building Construction Renovations
>
Responses
>
WAYPOINT CONTRACTING
>
WAYPOINT CONTRACTING
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2025 1:22:33 PM
Creation date
3/10/2025 1:21:51 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Sunny Isles Beach - ITB 25-01-01 <br />City Annex Building Construction Renovations <br />Phone: (786 ) 608-1 4 06 - Mailing: PO Box 558482, Miami, FL 33255 - www.waypointci.com <br />Contractor’s Site Protocol (daytime and nighttime) <br />•The project shall always be staffed with a competent site superintendent. The superintendent <br />shall act as a safety officer and will be responsible for all emergencies and safety protocols. <br />Any emergencies / differing work conditions shall be immediately reported to the owner <br />within a 1 hour’s period. To stay organized and have clear lines of communication between <br />all team members, Waypoint’s project management department uses the Reteam Software <br />throughout the construction phases. During the construction phase, this system allows the <br />team to keep track of plans & specifications, addendums, and even manage the budget for <br />the original scope of work. The program stores all this information, as well as subcontractor <br />proposals, and allows our team to prepare and submit information to the owner. <br />•To mitigate site hindrances and any issues occurring, we will communicate to the City and <br />staff to ensure that City patrons, staff and surrounding neighbors are aware of the schedule <br />and what is to occur so that no issues arise. <br />•Our projects are subject to strict conformance of Waypoint’s established Safety guidelines <br />and standards, to ensure our clients, sub-contractors and Waypoint staff are always <br />practicing safety, and Federal/local regulations. This includes the ability to reduce site <br />noises, have a safe site and zero tolerance for unruly and rude personnel on the site. <br />Waypoint is a zero-tolerance company and a Certified Drug-free Workplace Corporation. <br />•A project specific Quality Control Plan (QCP) will be developed for the project. It will define <br />the responsibilities and methods that will ensure each task is constructed in accordance with <br />the project scope, drawings, specifications, and any subsequent changes in a systematic and <br />deliberate manner. Furthermore, the plan will define systems, procedures, and processes for <br />achieving an outcome that is compliant with client’s intent. This planned process is designed <br />to provide a record of quality control activities as well as feedback to the designers of <br />records, the client, and to other appropriate stakeholders to identify inconsistencies in the <br />documents that affect the constructability, utility, and/or suitability of the final product. <br />However, the primary focus of the QCP is to ensure that the design s intent and needs are <br />met.
The URL can be used to link to this page
Your browser does not support the video tag.