My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RFP NE 174th Street Roadway Improvements (final)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 14-11-01 NE 174th St. Roadway Improvements
>
RFP NE 174th Street Roadway Improvements (final)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2014 4:22:14 PM
Creation date
11/4/2014 4:20:55 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
NE 174th Street Roadway Improvements
Bid No. (xx-xx-xx)
14-11-01
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />City of Sunny Isles Beach |Request for Proposal No. 14-11-01 22 <br /> <br />BID PROPOSAL FORM <br />CITY OF SUNNY ISLES BEACH <br />NE 174TH STREET ROADWAY IMPROVEMENTS <br />CSIB RFP NO. 14-11-01 <br />CAS PROJECT NO. 14-1758 <br /> <br />BIDDER AGREES TO PERFORM ALL THE WORK DESCRIBED IN THE CONTRACT DOCUMENTS TO PROVIDE <br />A COMPLETE PROJECT AS SHOWN ON THE PLANS AND SPECIFICATIONS FOR THE FOLLOWING LUMP SUM <br />AND/OR UNIT PRICES. <br /> <br />ITEM <br />NO DESCRIPTION QUANTITY UNIT <br />UNIT <br />COST TOTAL <br /> <br />The lump sum (LS) prices for items 1 through 10 shall be done in accordance with the contract documents and <br />specifications and all applicable federal, state, and local requirements. Costs for pre-construction video survey are to <br />be incorporated into item 1. <br />1 Mobilization and Demobilization (5%) 1 LS <br />2 <br />Maintenance of Traffic Including <br />Construction Sequencing 1 LS <br />SUBTOTAL ITEMS 1-2 $_____________ <br /> <br />The lump sum (LS) price for (phased) clearing & stripping shall include but not be limited to temporary storage, removal <br />and proper disposal of existing ground coverings, bus shelters, asphalt pavement, sidewalks, curb & gutter, concrete <br />pavement, limerock and subgrade (where applicable), and/or all other organic material from right of way to right of way <br />as necessary to perform the work stipulated in these contract documents. The lump sum price shall also include but not <br />be limited to removal, protection, storage of existing signs, decorative stone, landscaping, and sprinkler systems existing <br />within the work zone. All items shall be restored to as existing (suc h as existing pavers) or better condition and as per <br />plans. <br />3 Clearing and Stripping 1 LS
The URL can be used to link to this page
Your browser does not support the video tag.