My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RFP NE 174th Street Roadway Improvements (final)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 14-11-01 NE 174th St. Roadway Improvements
>
RFP NE 174th Street Roadway Improvements (final)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2014 4:22:14 PM
Creation date
11/4/2014 4:20:55 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
NE 174th Street Roadway Improvements
Bid No. (xx-xx-xx)
14-11-01
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />City of Sunny Isles Beach |Request for Proposal No. 14-11-01 23 <br /> <br />CITY OF SUNNY ISLES BEACH <br />NE 174TH STREET ROADWAY IMPROVEMENTS <br />CSIB RFP NO. 14-11-01 <br />CAS PROJECT NO. 14-1758 <br /> <br />BIDDER AGREES TO PERFORM ALL THE WORK DESCRIBED IN THE CONTRACT DOCUMENTS TO PROVIDE <br />A COMPLETE PROJECT AS SHOWN ON THE PLANS AND SPECIFICATIONS FOR THE FOLLOWING LUMP SUM <br />AND/OR UNIT PRICES. <br /> <br />ITEM <br />NO DESCRIPTION QUANTITY UNIT <br />UNIT <br />COST TOTAL <br />4 <br />NBR- North Bay Road South of NE 174th <br />Street Clearing and Stripping 1 LS <br />5 Laboratory Testing 1 LS <br />6 Survey Stakeout & As-builts 1 LS <br />7 <br />Stormwater Pollution Prevention Plan <br />(Required) & NPDES Permitting & <br />Monitoring where applicable 1 LS <br />SUBTOTAL ITEMS 3 - 7 $_____________ <br /> <br />LANDSCAPE AND IRRIGATION ITEMS 8 – 9 <br /> <br />The price for each item shall include but not be limited to all labor, equipment and materials necessary to install and <br />construct these items in accordance with these contract documents. All landscaping unit prices shall include soil <br />amendments needed i.e. mulch, soil, fertilizer and installation. <br />8 <br />AFI – Annual Flower. 12” SPR Pots 12” <br />O.A, 12” O.C. Selection by LA at time of <br />Planting 1,950 EACH
The URL can be used to link to this page
Your browser does not support the video tag.