My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2025-3808
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2025
>
Reso 2025-3808
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2025 10:11:48 AM
Creation date
4/9/2025 4:14:27 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2025-3808
Date (mm/dd/yyyy)
03/20/2025
Description
City Mgr. to negotiate an Agreement w/ Garland/DBS, Inc. to replace Roof at Government Center.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Garland/DBS, Inc. <br />3800 East 91 st Street <br />Cleveland, OH 44105 <br />Phone: (800) 762-8225 <br />Fax: (216) 883-2055 <br />ROOFING MATERIAL AND SERVICES PROPOSAL <br />City of Sunny Isles <br />Government Building <br />18070 Collins Ave <br />Sunny Isles Beach, FL 33160 <br />Date Submitted: 02/28/2025 <br />Proposal #: 25 -FL -250217 <br />MICPA # PW1925 <br />Flordia General Contractor License #: CGC1533467 <br />Purchase orders to be made out to: Garland/DBS, Inc. <br />[Mello <br />A Subsidlary of Garland Industries <br />Please Note: The following budget/estimate is being provided according to the pricing established <br />under the Master Intergovernmental Cooperative Purchasing Agreement (MICPA) with Racine <br />County, WI and OMNIA Partners, Public Sector (U.S. Communities). The line item pricing <br />breakdown from Attachment C: Bid Form should be viewed as the maximum price an agency will be <br />charged under the agreement. Garland/DBS, Inc. administered an informal competitive process for <br />obtaining quotes for the project with the hopes of providing a lower market -adjusted price whenever <br />possible. <br />Scope of Work: P1 and Lower Roof <br />1. Contractor to assemble staging area in a safe location and handle all debris in a <br />professional method with daily clean up. <br />2. Remove the existing roof down to the concrete deck. <br />3. Install a torch applied temp roof using HPR torch base. <br />4. Install new base layer of insulation using Polyisocyanurate insulation Tapered at %" in the <br />field, and V for all crickets. Refer to the NOA. <br />5. Insulation must have a minimum R-20 value. All Insulation layers are to be adhered to the <br />deck using'h"to 3/" wide beads of Insulock HR. Refer to roofing application standard RAS <br />117 for attachment methods. <br />6. Install new HDFiber board min ('/2" " thick ) using Insulock HR. Refer to roofing application <br />standard RAS 117 for attachment methods. <br />7. Install 1 ply of Flexbase 80 adhered to the coverboard using weatherking membrane <br />adhesive at a rate of 2.5 Gal / Sq. <br />8. Install one ply of the specified Mineral cap sheet using weatherking membrane adhesive at <br />a rate of 2.5 Gal/Sq. <br />9. Install all new Roxul cant strip around all curb and perimeter flashings. <br />10. Install 1 ply of specified base and one ply of the specified mineral cap sheet for all flashings <br />using the specified flashing adhesive. <br />11. If applicable, Install new wood blocking on parapet wall. <br />12. Install RMER Force drip Edge on all draining edge. <br />Page 1 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.