My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2025-3808
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2025
>
Reso 2025-3808
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2025 10:11:48 AM
Creation date
4/9/2025 4:14:27 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2025-3808
Date (mm/dd/yyyy)
03/20/2025
Description
City Mgr. to negotiate an Agreement w/ Garland/DBS, Inc. to replace Roof at Government Center.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
13. Install RMER Force Fascia on all non -draining edges. <br />14. Install termination bars and Kynar coated 040 Aluminum counter -flashings on adjacent <br />curtain walls and all curb flashings. <br />15. Fabricate new pitch pockets out of stainless steel #4. Fill the bottom half with fast curing <br />concrete and the top half with Seal _Tite. Fabricate umbrellas to cover the top of the pitch <br />pan. All construction to be soldered. <br />16. All drains to be sumped in a %Z": 12" in a 24" diameter around the drain. The contractor <br />must take this into account when ordering taper insulation. <br />17. In all areas surrounding internal drains, apply a target patch of Tuff Flash Liquid flashing <br />around all sumped parts of the drain. <br />18. Garland to issue the specified warranty including labor and materials. <br />19. Contractor to issue 5yr Warranty to Garland <br />20. Retain the existing upper section of the 2 -piece counter flashing. <br />21. Apply LiquiTec over the middle section to reinforce this assembly. Do not replace L <br />flashing. <br />22. Replace fasteners on all 2 piece counter flashing using stainless steel fasteners. <br />23. Wall flashings: Remove the flex seal from the counter flashing. Apply Tuff coat white in a <br />clean line 12" above the wall counter flashing extending the entire horizontal wall. <br />24. Include new clamping ring on all internal drains. <br />25. Include tapping threading the existing drain bowl to accommodate the new clamping ring as <br />needed. <br />26. Include new cast iron strainers Painted Red. <br />27. All counterflashing and sheet metal work shall be stainless steel #4, 24G. <br />28. Match existing insulation height. %" slope with proper crickets are required and are the <br />responsibility of the contractor. <br />29. All cap sheet shall be EUV mineral. Contractor shall take precautions from compromising <br />the cosmetic appearance of the roof. Cast granule into all bleed out. <br />Lower East: <br />1. Include stainless steel coping on this roof section. Wrap parapet wall with base and cap <br />sheet following Garland details. <br />2. Contractor to enlarge scuppers as needed to meet drainage requirements. <br />Add Alternate: Chiller Roof: <br />1. '/4" slope is required. Contractor responsible for positive drainage. <br />2. Include cool -sill silicone surfacing. 4G per Square Coverage. <br />Owners contingency $ 10,000 <br />0 o rc.ga—deff a-depon r " eEx e ' , ae W` Cortin if 8 8 2 <br />Garland/DBS Price Based U <br />Local Market Competition: <br />Pax Services $ 243,277 <br />PSI Roofing $ 283,217 <br />1' pQmai c8asedUponMar etEx1e mChi:e��� ,y: 0 ; <br />Owners contingency $ 10,000 <br />a c asedwiT M rket erre cer Wit (3ai ince aMIME. <br />,VmCGPvllYCb.c. - :fYwSY#L�"�..YYu..+E3.: <br />Page 2 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.