My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2025-3808
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2025
>
Reso 2025-3808
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2025 10:11:48 AM
Creation date
4/9/2025 4:14:27 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2025-3808
Date (mm/dd/yyyy)
03/20/2025
Description
City Mgr. to negotiate an Agreement w/ Garland/DBS, Inc. to replace Roof at Government Center.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
All areas: <br />1. Retain the existing upper section of the 2 piece Counter flashing. <br />2. Apply liquitec over the middle section to reinforce this assembly. Do not replace L flashing. <br />3. Replace fasteners on all 2 piece counter flashing using stainless steel fasteners. <br />4. Wall flashings: Remove the flex seal from the counter flashing. Apply Tuff coat white in a <br />clean line 12" above the wall counter flashing extending the entire horizontal wall. <br />5. Include new clamping ring on all internal drains. <br />6. Include tapping threading the existing drain bowl to accomodate the new clamping ring as <br />needed. <br />7. Include new cast iron strainers Painted Red. <br />8. All counterf Lashing and sheet metal work shall be stainless steel #4, 24G. <br />9. Match existing insulation height. 1/a" slope with proper crickets are required and are the <br />responsibility of the contractor. <br />10. All cap sheet shall be EUV mineral. Contractor shall take precautions from compromising <br />the cosmetic appearance of the roof. Cast granule into all bleed out. <br />Lower East: <br />1. Include stainless steel coping on this roof section. Wrap parapet wall with base and cap <br />sheet following Garland details. <br />2. Contractor to enlarge scuppers as needed to meet drainage requirements. <br />Chiller Roof: <br />1. Bid this separately as an add alternate. <br />2. 1/a" slope is required. Contractor responsible for positive drainage. <br />3. Include cool -sill silicone surfacing. 4G per Square Coverage. <br />
The URL can be used to link to this page
Your browser does not support the video tag.