Laserfiche WebLink
9. Install 1 ply of specified base and one ply of the specified mineral cap sheet for all flashings <br />using the specified flashing adhesive. <br />10. Install new wood blocking on parapet wall. <br />11. Install fabricated coping using stainless steel on all parapet walls. <br />12. Install termination bars and Kynar coated 040 Aluminum counter -flashings on adjacent <br />curtain walls and all curb flashings. <br />13. Fabricate new pitch pockets out of stainless steel #4. Fill the bottom half with fast curing <br />concrete and the top half with Seal _Tite. Fabricate umbrellas to cover the top of the pitch <br />pan. All construction to be soldered. <br />14. All drains to be sumped in a 'h": 12" in a 24" diameter around the drain. The contractor <br />must take this into account when ordering taper insulation. <br />15. In all areas surrounding internal drains, apply a target patch of Tuff Flash Liquid flashing <br />around all sumped parts of the drain. <br />16. Garland to issue the specified warranty including labor and materials. <br />17. Contractor to issue Syr Warranty to Garland <br />18. Wall flashings: Remove the flex seal from the counter flashing. Apply Tuff coat white in a <br />clean line 12" above the wall counter flashing extending the entire horizontal wall. <br />19. Include new clamping ring on all internal drains. <br />20. Include tapping / threading the existing drain bowl to accommodate the new clamping ring <br />as needed. <br />21. Include new cast iron strainers Painted Red. <br />22. All counterflashing and sheet metal work shall be stainless steel #4, 24G. <br />23. Match existing insulation height. 1/4" slope with proper crickets are required and are the <br />responsibility of the contractor. <br />All cap sheet shall be EUV mineral. Contractor shall take precautions from compromising the <br />cosmetic appearance of the roof. Cast granule into all bleed out <br />Owners contingency $ 10,000 <br />e e n c Z8 02 <br />Garland/DBS Price Based Upon Local Market Com <br />Pax Services <br />PSI Roofing <br />$ 243,277 <br />$ 283,217 <br />Owners contingency $ 10,000 <br />o o t >P .ice Bas o .e r e eri <br />Page 3 of 4 143 <br />