Resolution Number
2025-3823
Date (mm/dd/yyyy)
04/17/2025
Description
AWD ITB NO. 25-01-01, Approve Agmt w/ Waypoint Contracting, for Const. Renovation Svcs - Annex BLDG, 18050 Collins Ave.
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
221
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(b) claims of third parties against the City or the City's property, unless the <br />surety provides the City a written consent regarding the payment(s) in <br />question; <br />(c) failure by the Contractor to pay Subcontractors or others in a prompt and <br />proper fashion. The City may ask the surety for a written consent <br />regarding the payment(s) in question. However, notwithstanding the <br />foregoing, and provisions of Section 255.05 (11), Florida Statutes, the <br />parties hereby agree that the City may condition its payment to the <br />Contractor on the production of a release, waiver, or like documentation <br />from a Subcontractor or others demonstrating that the Subcontractor or <br />others do not have an outstanding claim for payments due on labor, <br />services or materials furnished under the Contract. In the event the City <br />requires such documentation, the provisions of the Local Government <br />Prompt Payment Act (Sections 218.70 through 218.79) shall be suspended <br />until such time as the City obtains the requested documentation; <br />(d) evidence that the balance of the Work cannot be completed in accordance <br />with the Contract for the unpaid balance of the Contract price; <br />(e) evidence that the Work will not be completed in the time required for <br />substantial or final completion; <br />(f) persistent failure to carry out the Work in accordance with the Contract; <br />(g) damage to the City or a third party to whom the City is, or may be, liable. <br />In the event that the City makes written demand upon the Contractor for amounts previously paid <br />by the City as contemplated in this Subparagraph 5.3.1, the Contractor shall comply with such <br />demand within ten (10) days of receipt of same. <br />5.4 Unexcused Failure to Pay <br />5.4.1. If within twenty-five (25) days after the date established herein for payment to the <br />Contractor by the City, the City, without cause or basis hereunder, fails to pay the Contractor any <br />amount then due and payable to the Contractor, then the Contractor may after ten (10) additional <br />days' written notice to the City and the Engineer / Architect and without prejudice to any other <br />available rights or remedies it may have, stop the Work until payment of those amounts due from <br />the City have been received. Any payment not made within twenty-five (25) days after the date due <br />shall bear interest at the City's investment earnings rate from the Florida State Board of <br />Administration. <br />5.5 Substantial Completion <br />5.5.1. When the Contractor believes the Work is substantially complete, the Contractor <br />shall submit to the Engineer / Architect a list of items to be completed or corrected; the Engineer <br />Page 9 of 42 <br />359 <br />
The URL can be used to link to this page
Your browser does not support the video tag.