My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2025-3823
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2025
>
Reso 2025-3823
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2026 11:18:34 AM
Creation date
4/24/2025 11:43:19 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2025-3823
Date (mm/dd/yyyy)
04/17/2025
Description
AWD ITB NO. 25-01-01, Approve Agmt w/ Waypoint Contracting, for Const. Renovation Svcs - Annex BLDG, 18050 Collins Ave.
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
221
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
/ Architect or the City may supplement such list in the event the Contractor has omitted any <br />incomplete or defective work. When the Engineer / Architect, on the basis of an inspection, and <br />after consultation with the City, determines the Work is in fact substantially complete, it will <br />prepare a Certificate of Substantial Completion which shall establish the date of Substantial <br />Completion, shall state the responsibilities of the City and the Contractor for Project security, <br />maintenance, heat, utilities, damage to the Work, and insurance, and shall fix the time within <br />which the Contractor shall complete the items listed therein. Guarantees required by the Contract <br />shall commence on the date of Substantial Completion of the Work. The Certificate of Substantial <br />Completion shall be submitted to the City and the Contractor for their written acceptance of the <br />responsibilities assigned to them in such certificate. <br />5.5.2. If required training, manuals, and equipment materials have not been provided, the <br />City will hold $5,000.00 plus 300% as stated in Section 5.5.1. <br />5.6 Completion and Final Payment <br />5.6.1. When all of the Work is finally complete and the Contractor is ready for a final <br />inspection, it shall notify the City and the Engineer / Architect thereof in writing. Thereupon, the <br />Engineer / Architect will make final inspection of the Work and, if the Work is complete in full <br />accordance with this Contract and this Contract has been fully performed, the Engineer / Architect <br />will promptly issue a final Certificate for Payment certifying to the City that the Project is complete <br />and the Contractor is entitled to the remainder of the unpaid Contract Price, less any amount <br />withheld pursuant to this Contract. If the Engineer / Architect is unable to issue its final Certificate <br />for Payment and is required to repeat its final inspection of the Work, the Contractor shall bear the <br />cost of such repeat final inspection(s) which cost may be deducted by the City from the Contractor's <br />final payment. <br />5.6.1.1. If the Contractor fails to achieve Final Completion within the time set forth in <br />Paragraph 3.1.1 hereinabove, the Contractor shall pay the City the amount of liquidated damages <br />set forth in paragraph 3.1.2 per day for each and every calendar day of unexcused delay in achieving <br />final completion beyond the date set forth herein for final completion of the Work. Any sums due <br />and payable hereunder by the Contractor shall be payable, not as a penalty, but as liquidated <br />damages representing an estimate of delay damages likely to be sustained by the City, estimated <br />at or before the time of executing this Contract. When the City reasonably believes that final <br />completion will be inexcusably delayed, the City shall be entitled, but not required, to withhold <br />from any amounts otherwise due the Contractor an amount then believed by the City to be <br />adequate to recover liquidated damages applicable to such delays. <br />5.6.2. As a condition precedent to final payment to the Contractor, the Contractor shall <br />deliver to the City the following documents in a form acceptable to the City: a final receipt and <br />release of the City; the Contractor's affidavit that all payrolls, invoices for materials and equipment, <br />and other liabilities connected with the Work for which the City, or the City's property might be <br />responsible, have been fully paid or otherwise satisfied; releases and waivers of lien from all <br />Subcontractors of the Contractor and of any and all other parties required by the Engineer / <br />Architect or the City; consent of surety to final payment; a duly executed assignment of any and all <br />warranties required by the Contract Documents; any and all operating manuals required by the <br />Contract Documents; certification that all personal instruction or training required by the Contract <br />Page 10 of 42 <br />360 <br />
The URL can be used to link to this page
Your browser does not support the video tag.