My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2025-3823
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2025
>
Reso 2025-3823
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2026 11:18:34 AM
Creation date
4/24/2025 11:43:19 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2025-3823
Date (mm/dd/yyyy)
04/17/2025
Description
AWD ITB NO. 25-01-01, Approve Agmt w/ Waypoint Contracting, for Const. Renovation Svcs - Annex BLDG, 18050 Collins Ave.
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
221
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
also furnish surveys, legal limitations and utility locations (if known), and a legal description, if <br />available, of the Project site. <br />6.1.4. The Contractor is responsible for compliance with, and shall secure at its expense, <br />all municipal review; construction, and inspection permits, provided, however, all City of Sunny <br />Isles Beach review, construction, and inspection fees will be waived save and except fees for <br />inspection. <br />6.2 Right to Stop Work <br />6.2.1. If the Contractor persistently fails or refuses to perform the Work in accordance with <br />this Contract, the City shall have the right, but not an obligation, to order the Contractor to stop <br />the Work, or any described portion thereof, until the cause for stoppage has been corrected, no <br />longer exists, or the City orders that Work be resumed. In such event, the Contractor shall <br />immediately obey such order. A stop work directive provided under this paragraph shall not entitle <br />the Contractor to an extension of the completion date. <br />6.3 City's Right to Perform Work <br />6.3.1. If the Contractor's Work is stopped by the City under Paragraph 6.2, or if the <br />Contractor persistently fails or refuses to perform the Work in accordance with this Contract, and <br />the Contractor fails within three (3) days of such stoppage, failure, or refusal, to provide adequate <br />assurance to the City that the cause of such stoppage will be eliminated or corrected, then the City <br />may, without prejudice to any other rights or remedies the City may have against the Contractor, <br />proceed to carry out the subject Work. In such a situation, an appropriate Change Order shall be <br />issued deducting from the Contract Price the cost of correcting the subject deficiencies, plus <br />compensation for the Engineer/Architect's additional services and expenses necessitated thereby, <br />if any. If the unpaid portion of the Contract Price is insufficient to cover the amount due the City, <br />the Contractor shall pay the difference to the City. <br />6.4 Inspections <br />6.4.1. No inspector shall have authority to waive any requirements of the Contract <br />Documents. Any failure or omission on the part of any inspector, the Engineer / Architect or any <br />agent of the City, to condemn any defective work or material shall not release the Contractor from <br />its obligations to install the Work free from faults and defects and to promptly remove and repair <br />any defective or deficient work. The Contractor hereby acknowledges and agrees that no inspector <br />shall have authority to: <br />(a) Authorize any deviation from the Contract Documents or approve any <br />substitute materials or equipment; <br />(b) Undertake any of the responsibilities of the Contractor, subcontractors or <br />Contractor's superintendent; <br />(c) Expedite the Work for the Contractor; <br />Page 12 of 42 <br />362 <br />
The URL can be used to link to this page
Your browser does not support the video tag.