My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2025-3823
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2025
>
Reso 2025-3823
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2026 11:18:34 AM
Creation date
4/24/2025 11:43:19 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2025-3823
Date (mm/dd/yyyy)
04/17/2025
Description
AWD ITB NO. 25-01-01, Approve Agmt w/ Waypoint Contracting, for Const. Renovation Svcs - Annex BLDG, 18050 Collins Ave.
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
221
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(d) Advise on or issue directions relative to any aspect of the means, methods, <br />techniques, sequences or procedures of construction unless such is <br />specifically called for in the Contract Documents; <br />(e) Advise on or issue directions as to safety precautions and programs in <br />connection with the Work. Provided however, this shall not preclude the City <br />inspector from notifying the Contractor of any hazardous or dangerous <br />condition; <br />(f) Participate in specialized field or laboratory tests. <br />6.5 Hours of Construction <br />6.5.1. The Contractor shall minimize the impact of the Project on the general public <br />ensuring that all service interruptions are kept to a minimum and providing temporary services, <br />structures, and facilities as required. The existing service to the residents and businesses may not <br />be interrupted for more than 4 hours without written permission from the City. The Contractor shall <br />perform work between the hours 7:00 AM and 7:00 PM Monday through Thursday and 7:00 AM — <br />5:00 PM on Fridays; and weekends with permission or as restricted by the local jurisdiction. Work <br />outside these hours or on weekends and holidays is prohibited without permission from the City. <br />6.6 Coordination and Scheduling of Work <br />6.6.1. The Contractor shall cooperate with the City and any separate contractors retained <br />by the City, and the Contractor shall carefully coordinate and schedule the Work as may be required <br />to accommodate without delay or interference the Work of the City or any of its separate <br />contractors. <br />6.7 Contractor Responsible for Delays <br />6.7.1. The Contractor shall be responsible for any damages caused to the City as a result of <br />any delays caused by the Contractor. <br />6.8 City's Right to Occupy <br />6.8.1. The City reserves the right to occupy any part of the Project when same is <br />Substantially Complete. It is expressly agreed, however, that partial occupancy of any part of the <br />Project does not activate any warranty obligations of the Contractor and any warranties which <br />contain time limitations shall commence on the date of Final Completion unless otherwise <br />expressly specified in the Contract Documents. <br />ARTICLE VII <br />THE CONTRACTOR <br />7.1. Upon providing no less than forty-eight (48) hours' notice to the Contractor, the City <br />may conduct a pre -construction conference at a time and place set forth in the aforesaid notice. <br />Page 13 of 42 <br />363 <br />
The URL can be used to link to this page
Your browser does not support the video tag.