Laserfiche WebLink
G Waypoint Contracting, Inc. <br />WAYPOINT Powered by RedTeam <br />25014 - Conceal and Additional Demolition <br />Manager: Yesid Guatame <br />Potential Change 02 <br />COST ESTIMATE <br />Summary by Cast Code <br />As of 6119/2025 <br />Phase <br />Cost Code <br />Description <br />quantity <br />Ulm <br />Labor ($) <br />Material ($) <br />Subcontract <br />Equipment ($) <br />Other ($) <br />Total ($) <br />No Phase <br />01301 <br />Project <br />4.00 <br />Hours <br />377.48 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />377.48 <br />Manager <br />Project Manager <br />4.00 <br />Hours <br />Labor <br />94.37 <br />= <br />377.48 <br />Project Manager <br />No Phase <br />01307 <br />Superintendent <br />8.00 <br />- Lump Sum <br />658.40 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />658.40 <br />Supennieodam <br />8.00 <br />Hours <br />Labor <br />82.30 <br />= <br />658.40 <br />Quality Control Manager <br />No Phase <br />02400 <br />Select <br />1.00 <br />Lump Sum <br />0.00 <br />0.00 <br />8,100.00 <br />0.00 <br />0.00 <br />8,100.00 <br />Demolition <br />Select <br />1.00 <br />Lump Sum <br />Subcontract <br />8,100.00 <br />8,100.00 <br />Demolition <br />Select Demolition <br />No Phase <br />31000 <br />Earthwork <br />1.00 <br />Lump Sum <br />0.00 <br />0.00 <br />3,500.00 <br />0.00 <br />0.00 <br />3,500.00 <br />Infill Material <br />1.00 <br />Lump Sum <br />Subcontract <br />3,500.00 <br />= <br />3,500.00 <br />After Removal <br />of Poundations <br />Earthwork <br />SUBTOTAL <br />1,035.88 <br />0.00 <br />11,600.00 <br />0.00 <br />0.00 <br />12,635.88 <br />DIRECT COSTS <br />Indirect Costs <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />Indirect Cost <br />0.00% <br />0.00% <br />0.00% <br />0,00% <br />0.00 <br />Allocation Rates <br />