Laserfiche WebLink
i'A=...T GEN <br />Next Gen Construction & Demolition <br />20000 NW 83rd Ct <br />Hialeah, FL <br />33015, US <br />(786) 202-5693 <br />Prepared By: <br />Bryan Vega <br />(786) 202-5693 <br />bryan@nextgenmiami.net <br />F'reiect Sunny Isles annex Additional Items <br />Scope of Work <br />Quote: 1581 / Date: 6/19/2025 <br />Customer <br />Waypoint Contracting <br />Lim Blanc <br />786-608-1406 <br />(blanc@waypointci.com <br />Proposals includes dumpersters or debris removal with trailers. If you would like for it to be removed, please <br />specify. <br />Interior Demolitions include removal of MEP ( Ducts, Wires & Pipes ONLY ). AHU Units are seperate items. <br />Default Group <br />Q antity <br />20"-24" Concrete slab removal & disposal 970 sq ft <br />Description: Removal & Disposal of concrete slab <br />Reinforced top & Bottom #5 Rebar 12" OC Both Ways. <br />Bollard Foundation 45 ft <br />Description. Removal & Disposal of complete Bollard <br />Foundation. 5-6 Ft. <br />Notes <br />Disclaimer: This proposal is based on the information provided at the time of pricing and does not constitute a <br />final or binding agreement. All quantities, pricing, and scope items are subject to verification. <br />Final pricing and scope confirmation are contingent upon a physical site walkthrough conducted by a <br />representative of Next Gen Construction & Demolition. Any discrepancies identified during the walkthrough may <br />result in revisions to this proposal. <br />