Laserfiche WebLink
<br />ITB 24-06-02 CITYWIDE LANDSCAPING SERVICES 40 <br /> <br />CITY OF SUNNY ISLES BEACH <br />18070 Collins Ave. | Sunny Isles Beach, FL 33160 <br />305.792.1707 | sibfl.net | Purchasing@sibfl.net <br />3.5.1 MOT OF RIGHT-OF-WAYS <br />Maintenance of Traffic shall be in accordance with the current edition of the Florida <br />Department of Transportation, Standard Plans and Specification for Road and Bridge <br />Construction, and the Manual on Uniform Traffic Control Devices, as minimum criteria. <br />This note should be included under all proposal items that may include work on both <br />FDOT and all City roadways. All traffic control costs shall be a part of the unit price bid <br />and shall not be paid for separately. <br /> <br />3.5.2 The Contractor is responsible to have required FDOT certification, including but not <br />limited to those in Section 2.2.B, for initiating, installing, and maintaining all temporary <br />traffic control devices within FDOT rights-of-way in accordance with the latest FDOT <br />standard specifications. <br /> <br />3.5.3 Due to construction projects within the City, FDOT may require that tree pruning be <br />completed at night. <br /> <br />No lane closures, other than in case of an emergency, is allowed, during the time periods <br />of 6:00 AM – 9:00 AM and 4:00 PM – 7:00 PM. The Contractor is responsible to perform <br />the work in accordance with FDOT requirements at no additional cost to the City. If a lane- <br />closure is needed in interior streets, approval must be obtained from the city prior to <br />lane-closure. <br /> <br />3.6 IRRIGATION SYSTEM MAINTENANCE <br />The Contractor must be responsible for the complete management, operation, and <br />maintenance of all irrigation systems. Within thirty (30) days of Contract execution, the <br />Contractor must complete an assessment at no additional cost to the City to determine what <br />repairs are required at each Project Site to bring each Irrigation System to full operations. This <br />assessment will provide a detailed breakdown by Project Site of the repair work required and <br />cost of repair. Contractor will be responsible for each Irrigation system once it is fully <br />operational. <br /> <br />Contractor shall purchase irrigation supplies from the city’s assigned vendor: Currently SiteOne <br />Landscaping Supply, subject to change during length of contract. <br /> <br />All improved and existing areas must receive sufficient amounts of water to flower beds, turf <br />and landscaping, as necessary to present a uniform green color without browning or barren <br />areas resulting from lack of water. <br /> <br />Contractor is responsible to ensure that irrigation system is appropriate for the plant material. <br />The onus will be on the contractor for failure to properly inspect and notify the city of any <br />recommended retrofitting prior to installation. Any dead or under-developing plants shall be <br />immediately replaced by the Contractor at no cost to the City. <br /> <br />The Contractor, at his/her expense, will be responsible for the proper maintenance, <br />replacement, repair, or retro-fitting of all irrigation components. If supplies are not available