My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2025-3841
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2025
>
Reso 2025-3841
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2025 12:17:22 PM
Creation date
6/12/2025 9:47:15 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2025-3841
Date (mm/dd/yyyy)
05/15/2025
Description
Approving an Agrmnt w/ Commercial Interior Contractors Corp., for renovations services of the 4th Floor of Government Center.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The renovation project consists of: <br />• Removal of existing wallpaper <br />• Skimming/Sanding and Painting walls <br />• Moving all furniture (Cubicles) <br />• Renovated 4th Floor Conference Room Furniture <br />• After Hours Removal of existing carpet and baseboards <br />• After Hours Installation of new Carpet and baseboards <br />• After Hours removal of wallpaper, wall skimming, sanding and painting <br />• VCT removal and installation in breakroom and supplies room after hours. <br />Square footage of 4th Floor: <br />• Carpet4940sgft. <br />• VCT 300sgft. <br />Total: 5,240sgft. <br />The city is requesting approval to award Commercial Interior Contractors a contract in a NTE amount of <br />$275,561.08, which includes $61,000 of contingency due to potential tariffs on the carpet products. <br />ADDITIONAL INFORMATION: <br />The fourth floor of the Government Center, unlike floors one through three, were designed with <br />wallpaper. This wallpaper limits our ability to manage replacement or repair in-house. This proposal, to <br />remove the wallpaper and replace it with a painted surface like the other floors, will ensure that future <br />generations in this building can maintain the facility in a good quality standard without this added <br />expense. Additionally, utilizing carpet tiles will also provide the ability to repair a damaged piece <br />without the need to replace the entire floor. This is a cost savings for the future maintenance of this <br />facility. <br />Copies of the complete contract file, including all exhibits and attachments, are on files with the Office of <br />the City Clerk and are available upon request. <br />FUNDING SOURCE: <br />Funds have been appropriated in Account No. 001-5-5391-465000 — Capital outlay & 001-5-5391- <br />446003 R&M Bldg. <br />ATTACHMENTS: <br />Resolution <br />Item Number: 9.J <br />222 <br />
The URL can be used to link to this page
Your browser does not support the video tag.