My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INVITATION TO BID 25-06-01 CITYWIDE HVAC MANAGEMENT SYSTEM PREVENTATIVE MAINTENANCE
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(25-06-01) Citywide HVAC Mgmt System Preventative Maintenance
>
INVITATION TO BID 25-06-01 CITYWIDE HVAC MANAGEMENT SYSTEM PREVENTATIVE MAINTENANCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2025 9:25:10 AM
Creation date
7/2/2025 9:24:27 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br /> <br />24 <br />ITB 25-06-01 CITYWIDE HVAC MANAGEMENT PREVENTATIVE MAINTENANCE <br /> <br />CITY OF SUNNY ISLES BEACH <br />18070 Collins Ave. | Sunny Isles Beach, FL 33160 <br />305.792.1707 | sibfl.net | Purchasing@sibfl.net <br />Specifically list any projects, either complete or underway, that are located in <br />Miami-Dade, Broward or Palm Beach, Florida Counties. <br /> <br /> Bidder must address the Minimum Qualification Requirements A – C, per <br />Section 2.2 of ITB. <br /> <br />3. Staffing <br /> <br />Relevant experience and qualifications of key personnel, including key personnel of <br />subcontractors, that will be assigned to this project and experience and qualifications of <br />subcontractors <br /> <br />• The size and experience of the company staff pool from which staff assigned to <br />the management contract can be drawn. <br />• The composition of the staff team that will be assigned to the contract. <br />• The name of the person who will be responsible for the coordination of work. <br />• Experience and qualifications of staff and satisfactory record of performance of <br />staff <br />• Each proposal must identify the name(s) and address(es) of all Subcontractors, <br />suppliers and other persons and organizations including those who are to furnish <br />the principal items of material and equipment. If requested by City after Bid <br />Opening and before Award, the successful Bidder shall submit to City additional <br />detail on any or all Subcontractors or Suppliers including without limitation, <br />pertinent information regarding similar projects, and other evidence of <br />qualification for each such Subcontractor, Supplier, other persons or <br />organization. <br /> <br />4. Approach / Methodology <br /> <br />Bidders’ approach methodology to providing the services requested in this solicitation <br />must reference: <br /> <br /> Suitability of the methodologies and approaches used in achieving tasks. <br /> Overall organization to completing the project. <br /> Work plan explaining how they intend on meeting the established deadlines. <br /> Bidders are required to provide an Emergency Response Plan with 2 Hour <br />Response for emergency call-outs (submit with bid). <br /> Bidders shall specify on the attached Bid Form the estimated <br />response/mobilization time necessary to get crews working after contract <br />award. <br /> <br /> 5. Corporate Standing and Authorized Signatory <br /> <br />Bidders must demonstrate that the company is in good standing and that the person <br />signing this submittal is an Authorized Signatory on behalf of the Bidders to sign bids,
The URL can be used to link to this page
Your browser does not support the video tag.