Laserfiche WebLink
Contractor, Price Proposal Details -Category <br />Date: 8/7/2025 <br />Work Order #: 247860 <br />Title: SIB- 177th Emergency sink hole/curb inlet repair <br />Contractor: EZIQC - Team Contracting. Inc. <br />Contractor Number: FL -R7 -GC -092524 -TCI <br />Job Order Value: $57,990.54 <br />Proposal Name: <br />SIB- 177th Emergency sink hole/curb inlet repair <br />Proposal Value: <br />$57,990.54 <br />CSI Number <br />Mod UOM <br />Description <br />LineTotal' <br />1-Dr6inageWork <br />1 0122 23 00-0231 <br />EA <br />Placement And Removal Of Steel Roadway Plates <br />$1,421.19 <br />Qty Unit Price Factor Total <br />Installation 36 X $34.05 X 1.1594 $1,421.19 <br />Contractor Notes: <br />12 Placement and Removal for Drainage Work for cover open holes <br />2 01 22 23 00-0233 <br />WK <br />1" x 4'x 8' Steel Plate <br />$258.48 <br />Qty Unit Price Factor Total <br />Installation 2 X $111.47 X 1.1594 $258.48 <br />Contractor Notes: <br />For Drainage Work 2 Road Plate = 2 Each. <br />3 01 71 13 00-0003 <br />EA <br />Equipment Delivery, Pickup, Mobilization And Demobilization Using <br />$4,482.77 <br />A Tractor Trailer With Up To 53' Bedlncludes loading, tie -down of <br />equipment, delivery of equipment, off loading on site, rigging, <br />dismantling, loading for return and transporting away. For <br />equipment such as bulldozers, motor scrapers, hydraulic <br />excavators, gradalls, road graders, loader-backhoes, heavy duty <br />construction loaders, tractors, pavers, rollers, bridge finishers, <br />straight mast construction forklifts, telescoping boom rough terrain <br />construction forklifts, telescoping and articulating boom man lifts <br />with >40' boom lengths, etc. <br />Qty Unit Price Factor Total <br />Installation 3 X $1,288.82 X 1.1594 $4,482.77 <br />Contractor Notes: <br />Mobilization for Drainage Work - 1 for Bobcat, 1 For Mini <br />Excavator, 1 for Tool Truck. <br />4 01 74 19 00-0035 <br />CY <br />Asphalt, Concrete, Gravel And Subgrade Material, Landfill Dump <br />$987.53 <br />Fee <br />Qty Unit Price Factor Total <br />Installation 28 X $30.42 X 1.1594 $987.53 <br />Contractor Notes: <br />For Drainage Work 28 CY <br />5 01 74 19 00-0037 <br />CYM <br />Hauling On Paved Roads, First 15 Miles <br />$467.47 <br />Qty Unit Price Factor Total <br />Installation 420 X $0.96 X 1.1594 $467.47 <br />Contractor Notes: <br />For Drainage Work 28 CYX 15 = 420 CYM <br />6 01 74 19 00-0037 <br />CYM <br />Hauling On Paved Roads, First 15 Miles <br />$506.37 <br />Qty Unit Price Factor Total <br />Installation 454.95 X $0.96 X 1.1594 $506.37 <br />Contractor Notes: <br />For Drainage Work 30.33 CYX 15 = 454.95 CYM <br />Contractor Price Proprosal Details - Category <br />1 of 8 <br />This report was not generated or reviewed by your Account Manager of The Gordian Group <br />