Laserfiche WebLink
CSI Number <br />Mod UOM <br />Description <br />LineTotal <br />1=Drainage Work <br />Installation 13.33 X $14.69 X 1.1594 $227.03 <br />7 01 74 19 00-0038 <br />CYM <br />Hauling On Paved Roads, Miles Over Initial 15 Miles <br />$337.58 <br />10 02 41 13 13-0026 SY <br />>3" To 6" By Machine, Break-up And Remove Non -Reinforced <br />Qty Unit Price Factor <br />Total <br />Concrete Paving <br />Installation 454.95 X $0.64 X 1.1594 <br />$337.58 <br />Contractor Notes: <br />For Drainage Work 30.33 CYX 15 = 454.95 CYM <br />8 01 74 19 00-0038 <br />CYM <br />Hauling On Paved Roads, Miles Over Initial 15 Miles <br />$311.65 <br />Break -Up And Remove >6" x 24" Concrete Curb And Gutter By <br />$241.16 <br />Qty Unit Price Factor <br />Total <br />Installation 420 X $0.64 X 1.1594 <br />$311.65 <br />Contractor Notes: <br />For Drainage Work 28 CYX 15 = 420 CYM <br />Contractor Notes: <br />9 02 41 13 13-0020 SY <br />>3" To 6" By Machine, Break-up And Remove Bituminous Paving <br />$227.03 <br />Qty Unit Price Factor Total <br />Installation 13.33 X $14.69 X 1.1594 $227.03 <br />Contractor Notes: <br />For Pipe Installation <br />10 02 41 13 13-0026 SY <br />>3" To 6" By Machine, Break-up And Remove Non -Reinforced <br />$319.10 <br />Concrete Paving <br />Qty Unit Price Factor Total <br />Installation 17 X $16.19 X 1.1594 $319.10 <br />Contractor Notes: <br />For Pipe Installation <br />11 02 41 13 13-0056 LF <br />Break -Up And Remove >6" x 24" Concrete Curb And Gutter By <br />$241.16 <br />Machine <br />Qty Unit Price Factor Total <br />Installation 25 X $8.32 X 1.1594 $241.16 <br />Contractor Notes: <br />For Pipe Installation <br />12 02 41 19 13-0058 EA <br />Saw Cut Minimum ChargeFor projects where the total saw cutting <br />$905.99 <br />charge is less than the minimum charge, use this task exclusively. <br />This task should not be used in conjunction with any other tasks in <br />this section. <br />Qty Unit Price Factor Total <br />Installation 1 X $781.43 X 1.1594 $905.99 <br />Contractor Notes: <br />For Drainage Work <br />13 31 23 16 13-0005 CY <br />Over 12" Wide, Excavation for Trenching by Machine in Loose <br />$298.34 <br />Rocklncludes compacted aggregate <br />Qty Unit Price Factor Total <br />Installation 28 X $9.19 X 1.1594 $298.34 <br />Contractor Notes: <br />For Pipe Installation <br />14 31 23 16 13-0005 0063 MOD <br />For >20 To 50, Add <br />$223.67 <br />Qty Unit Price Factor Total <br />Installation 28 X $6.89 X 1.1594 $223.67 <br />15 31 23 16 13-0011 CY <br />Backfilling or Placing Subbase for Trenches with Imported or <br />$669.89 <br />Stockpiled Materials by Hand <br />Qty Unit Price Factor Total <br />Installation 30.33 X $19.05 X 1.1594 $669.89 <br />Contractor Notes: <br />For Pipe Installation <br />16 3123 16 13-0013 CY <br />Compaction of Fill or Subbase for Trenches by Vibratory Plate, Air <br />$142.07 <br />Tamper, Etcetera <br />Qty Unit Price Factor Total <br />Installation 30.33 X $4.04 X 1.1594 $142.06 <br />Contractor Notes: <br />For Pipe Installation <br />Contractor Price Proprosal Details - Category <br />2 of 8 <br />This report was not generated or reviewed by your Account Manager of The Gordian Group <br />