My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2025-3868
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2025
>
Reso 2025-3868
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2025 9:13:28 AM
Creation date
9/4/2025 4:38:13 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2025-3868
Date (mm/dd/yyyy)
08/21/2025
Description
City Mgr to negotiate and execute Agreement w/ Team Contracting, Inc, for emergency repairs to storm drain at 177th Drive.
Supplemental fields
Comment
Reso 2025-3839 was on HOLD per Purchasing and City Attorney. This is VOIDED...this is tne new Reso 2025-3868.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GSI Number Mod UOM Description LineTotal <br />2 -Concrete Work <br />27 01 71 13 00-0003 EA Equipment Delivery, Pickup, Mobilization And Demobilization Using $2,988.52 <br />A Tractor Trailer With Up To 53' Bedlncludes loading, tie -down of <br />equipment, delivery of equipment, off loading on site, rigging, <br />dismantling, loading for return and transporting away. For <br />equipment such as bulldozers, motor scrapers, hydraulic <br />excavators, gradalls, road graders, loader-backhoes, heavy duty <br />construction loaders, tractors, pavers, rollers, bridge finishers, <br />straight mast construction forklifts, telescoping boom rough terrain <br />construction forklifts, telescoping and articulating boom man lifts <br />with >40' boom lengths, etc. <br />Qty Unit Price Factor Total <br />Installation 2 X $1,288.82 X 1.1594 $2,988.52 <br />Contractor Notes: Mobilization for Concrete Work <br />28 01 74 13 00-0003 <br />CY <br />Collect Existing Debris And Load Into Truck Or DumpsterPer CY of <br />$476.13 <br />debris removed. <br />Qty Unit Price Factor Total <br />Installation 30.33 X $13.54 X 1.1594 $476.13 <br />Contractor Notes: <br />Swk Removal = 17 CY+ Curb Removal = 13.33 = 30.33 CY <br />29 0174 19 00-0035 <br />CY <br />Asphalt, Concrete, Gravel And Subgrade Material, Landfill Dump <br />$1,069.71 <br />Fee <br />Qty Unit Price Factor Total <br />Installation 30.33 X $30.42 X 1.1594 $1,069.71 <br />Contractor Notes: <br />Swk Removal = 17 CY + Curb Removal = 13.33 = 30.33 CY <br />30 02 41 19 13-0058 <br />EA <br />Saw Cut Minimum ChargeFor projects where the total saw cutting <br />$905.99 <br />charge is less than the minimum charge, use this task exclusively. <br />This task should not be used in conjunction with any other tasks in <br />this section. <br />Qty Unit Price Factor Total <br />Installation 1 X $781.43 X 1.1594 $905.99 <br />Contractor Notes: <br />For Concrete Work <br />31 31 23 16 13-0004 <br />CY <br />12" Wide or Less, Excavation for Trenching by Machine in Loose <br />$299.96 <br />Rocklncludes compacted aggregate <br />Qty Unit Price Factor Total <br />Installation 22 X $11.76 X 1.1594 $299.96 <br />Contractor Notes: For Sidewalk and Curb Installation <br />32 3123 16 13-0004 <br />0063 MOD <br />For>20 To 50, Add <br />$224.97 <br />Qty Unit Price Factor Total <br />Installation 22 X $8.82 X 1.1594 $224.97 <br />33 32 1129 13-0002 <br />SY <br />6" Thick FDOT Limerock <br />$5,123.26 <br />Qty Unit Price Factor Total <br />Installation 77.77 X $56.82 X 1.1594 $5,123.26 <br />Contractor Notes: <br />Base for Curb = 8.33 SY + Sidewalk = 69.44 SY Total = 77.77 SY <br />34 32 11 29 13-0002 <br />0008 MOD <br />For Up To 500, Add <br />$1,083.80 <br />Qty Unit Price Factor Total <br />Installation 77.77 X $12.02 X 1.1594 $1,083.80 <br />35 32 16 13 13-0031 <br />LF <br />FDOT Type F 6" x 24" Concrete Gutter With 6" Curb - Radius <br />$873.32 <br />Qty Unit Price Factor Total <br />Installation 25 X $30.13 X 1.1594 $873.32 <br />Contractor Notes: <br />New Curb Installation <br />Contractor Price Proprosal Details - Category 4 of 8 <br />This report was not generated or reviewed by your Account Manager of The Gordian Group <br />
The URL can be used to link to this page
Your browser does not support the video tag.