Laserfiche WebLink
CSI Number Mod UOM Description UneTotal <br />.2 -Concrete Work <br />36 32 16 13 13-0031 0056 MOD For>20 To 50, Add $320.57 <br />Qty Unit Price Factor Total <br />Installation 25 X $11.06 X 1.1594 $320.57 <br />37 32 16 23 00-0007 <br />SF For Exposed Aaareaate Finish In Sidewalk <br />Qty Unit Price Factor Total <br />Installation 625 X $1.25 X 1.1594 $905.78 <br />Contractor Notes: New Sidewalk Installation <br />$905.78 <br />38 32 16 23 00-0013 SF 6" Thick, 3,000 PSI, Cast In Place Concrete Sidewalk With Fiber $5,963.66 <br />Mesh <br />Qty Unit Price Factor Total <br />Installation 625 X $8.23 X 1.1594 $5,963.66 <br />Contractor Notes: New Sidewalk Installation <br />Subtotal for 2 -Concrete Work: $20,235.67 <br />3-Roatl Work <br />39 0171 13 00-0003 EA Equipment Delivery, Pickup, Mobilization And Demobilization Using $2,988.52 <br />A Tractor Trailer With Up To 53' Bedlncludes loading, tie -down of <br />equipment, delivery of equipment, off loading on site, rigging, <br />dismantling, loading for return and transporting away. For <br />equipment such as bulldozers, motor scrapers, hydraulic <br />excavators, gradalls, road graders, loader-backhoes, heavy duty <br />construction loaders, tractors, pavers, rollers, bridge finishers, <br />straight mast construction forklifts, telescoping boom rough terrain <br />construction forklifts, telescoping and articulating boom man lifts <br />with >40' boom lengths, etc. <br />This report was not generated or reviewed by your Account Manager of The Gordian Group <br />Qty Unit Price Factor <br />Total <br />Installation 2 X $1,288.82 X 1.1594 <br />$2,988.52 <br />Contractor Notes: <br />Asphalt Work Preparation install 1st Lift, 2nd Lift and Mobilization <br />of Equipment. <br />40 01 74 19 00-0035 <br />CY <br />Asphalt, Concrete, Gravel And Subgrade Material, Landfill Dump <br />$146.37 <br />Fee <br />Qty Unit Price Factor <br />Total <br />Installation 4.15 X $30.42 X 1.1594 <br />$146.37 <br />Contractor Notes: <br />3 -Road Work <br />41 01 74 19 00-0037 <br />CYM <br />Hauling On Paved Roads, First 15 Miles <br />$69.29 <br />Qty Unit Price Factor <br />Total <br />Installation 62.25 X $0.96 X 1.1594 <br />$69.29 <br />Contractor Notes: <br />Asphalt Work = 4.15 CYX 15 = 62.25 CYM <br />42 01 74 19 00-0038 <br />CYM <br />Hauling On Paved Roads, Miles Over Initial 15 Miles <br />$46.19 <br />Qty Unit Price Factor <br />Total <br />Installation 62.25 X $0.64 X 1.1594 <br />$46.19 <br />Contractor Notes: <br />Asphalt Work = 4.15 CYX 15 = 62.25 CYM <br />43 02 41 13 13-0020 <br />SY <br />>3" To 6" By Machine, Break-up And Remove Bituminous Paving <br />$302.82 <br />Qty Unit Price Factor <br />Total <br />Installation 17.78 X $14.69 X 1.1594 <br />$302.82 <br />Contractor Notes: <br />Asphalt Work = 4 x 40 = 160/9 = 17.78 SY <br />Contractor Price Proprosal Details - Category <br />5 of 8 <br />This report was not generated or reviewed by your Account Manager of The Gordian Group <br />