Subtotal for 3 -Road Work: $8,618.54
<br />4 -Additional Scope of Work
<br />52 01 71 1300-0003 EA Equipment Delivery, Pickup, Mobilization And Demobilization Using $2,988.52
<br />A Tractor Trailer With Up To 53' Bedlncludes loading, tie -down of
<br />equipment, delivery of equipment, off loading on site, rigging,
<br />dismantling, loading for return and transporting away. For
<br />equipment such as bulldozers, motor scrapers, hydraulic
<br />excavators, gradalls, road graders, loader-backhoes, heavy duty
<br />construction loaders, tractors, pavers, rollers, bridge finishers,
<br />straight mast construction forklifts, telescoping boom rough terrain
<br />construction forklifts, telescoping and articulating boom man lifts
<br />with >40' boom lengths, etc.
<br />Qty Unit Price Factor Total
<br />Installation 2 X $1,288.82 X 1.1594 $2,988.52
<br />Contractor Notes: 1 mobilization for Demolition and excavation and 1 Mobilization for
<br />Delivery of the New Structure
<br />Contractor Price Proprosal Details - Category 6 of 8
<br />This report was not generated or reviewed by your Account Manager of The Gordian Group
<br />CSI Number
<br />Mod UOM
<br />Description
<br />LineTotal
<br />3 -Road Work
<br />44
<br />02 41 19 13-0058
<br />EA
<br />Saw Cut Minimum ChargeFor projects where the total saw cutting
<br />$905.99
<br />charge is less than the minimum charge, use
<br />this task exclusively.
<br />This task should not be used in conjunction
<br />with any other tasks in
<br />this section.
<br />Qty Unit Price
<br />Factor
<br />Total
<br />Installation 1 X $781.43 X
<br />1.1594
<br />$905.99
<br />Contractor Notes:
<br />For Asphalt Work Cutting Asphalt
<br />45
<br />31 24 13 00-0005
<br />CY
<br />Cut, Shape, and Rough Grading for Roadways, Parking Areas,
<br />$24.97
<br />Landscaping and Embankments by Machine in Loose
<br />Rocklncludes compacted aggregate
<br />Qty Unit Price
<br />Factor
<br />Total
<br />Installation 4.15 X $5.19 X
<br />1.1594
<br />$24.97
<br />Contractor Notes:
<br />3 -Road Work
<br />46
<br />31 24 13 00-0005
<br />0038 MOD
<br />For Up To 20, Add
<br />$24.97
<br />Qty Unit Price
<br />Factor
<br />Total
<br />Installation 4.15 X $5.19 X
<br />1.1594
<br />$24.97
<br />47
<br />32 11 29 13-0003
<br />SY
<br />8" Thick FDOT Limerock
<br />$1,555.34
<br />Qty Unit Price
<br />Factor
<br />Total
<br />Installation 17.78 X $75.45 X
<br />1.1594
<br />$1,555.34
<br />Contractor Notes:
<br />Asphalt Work = 4 x 40 = 160/9 = 17.78 SY
<br />48
<br />32 1129 13-0003
<br />0008 MOD
<br />For Up To 500, Add
<br />$329.21
<br />Qty Unit Price
<br />Factor
<br />Total
<br />Installation 17.78 X $15.97 X
<br />1.1594
<br />$329.21
<br />49
<br />32 12 13 19-0003
<br />SY
<br />Surface Prime Coat, 0.30 Gallon/SY
<br />$42.26
<br />Qty Unit Price
<br />Factor
<br />Total
<br />Installation 17.78 X $2.05 X
<br />1.1594
<br />$42.26
<br />Contractor Notes: Asphalt Work = 4 x 40 = 160/9 = 17.78 SY
<br />50
<br />32 12 16 13-0064
<br />TON
<br />Friction Course With Rubber, FC -5
<br />$1,164.05
<br />Qty Unit Price
<br />Factor
<br />Total
<br />Installation 3 X $334.67 X
<br />1.1594
<br />$1,164.05
<br />51
<br />32 12 16 13-0064
<br />0587 MOD
<br />For Up To 5, Add
<br />$1,018.56
<br />Qty Unit Price
<br />Factor
<br />Total
<br />Installation 3 X $292.84 X
<br />1.1594
<br />$1,018.56
<br />Subtotal for 3 -Road Work: $8,618.54
<br />4 -Additional Scope of Work
<br />52 01 71 1300-0003 EA Equipment Delivery, Pickup, Mobilization And Demobilization Using $2,988.52
<br />A Tractor Trailer With Up To 53' Bedlncludes loading, tie -down of
<br />equipment, delivery of equipment, off loading on site, rigging,
<br />dismantling, loading for return and transporting away. For
<br />equipment such as bulldozers, motor scrapers, hydraulic
<br />excavators, gradalls, road graders, loader-backhoes, heavy duty
<br />construction loaders, tractors, pavers, rollers, bridge finishers,
<br />straight mast construction forklifts, telescoping boom rough terrain
<br />construction forklifts, telescoping and articulating boom man lifts
<br />with >40' boom lengths, etc.
<br />Qty Unit Price Factor Total
<br />Installation 2 X $1,288.82 X 1.1594 $2,988.52
<br />Contractor Notes: 1 mobilization for Demolition and excavation and 1 Mobilization for
<br />Delivery of the New Structure
<br />Contractor Price Proprosal Details - Category 6 of 8
<br />This report was not generated or reviewed by your Account Manager of The Gordian Group