Laserfiche WebLink
Subtotal for 3 -Road Work: $8,618.54 <br />4 -Additional Scope of Work <br />52 01 71 1300-0003 EA Equipment Delivery, Pickup, Mobilization And Demobilization Using $2,988.52 <br />A Tractor Trailer With Up To 53' Bedlncludes loading, tie -down of <br />equipment, delivery of equipment, off loading on site, rigging, <br />dismantling, loading for return and transporting away. For <br />equipment such as bulldozers, motor scrapers, hydraulic <br />excavators, gradalls, road graders, loader-backhoes, heavy duty <br />construction loaders, tractors, pavers, rollers, bridge finishers, <br />straight mast construction forklifts, telescoping boom rough terrain <br />construction forklifts, telescoping and articulating boom man lifts <br />with >40' boom lengths, etc. <br />Qty Unit Price Factor Total <br />Installation 2 X $1,288.82 X 1.1594 $2,988.52 <br />Contractor Notes: 1 mobilization for Demolition and excavation and 1 Mobilization for <br />Delivery of the New Structure <br />Contractor Price Proprosal Details - Category 6 of 8 <br />This report was not generated or reviewed by your Account Manager of The Gordian Group <br />CSI Number <br />Mod UOM <br />Description <br />LineTotal <br />3 -Road Work <br />44 <br />02 41 19 13-0058 <br />EA <br />Saw Cut Minimum ChargeFor projects where the total saw cutting <br />$905.99 <br />charge is less than the minimum charge, use <br />this task exclusively. <br />This task should not be used in conjunction <br />with any other tasks in <br />this section. <br />Qty Unit Price <br />Factor <br />Total <br />Installation 1 X $781.43 X <br />1.1594 <br />$905.99 <br />Contractor Notes: <br />For Asphalt Work Cutting Asphalt <br />45 <br />31 24 13 00-0005 <br />CY <br />Cut, Shape, and Rough Grading for Roadways, Parking Areas, <br />$24.97 <br />Landscaping and Embankments by Machine in Loose <br />Rocklncludes compacted aggregate <br />Qty Unit Price <br />Factor <br />Total <br />Installation 4.15 X $5.19 X <br />1.1594 <br />$24.97 <br />Contractor Notes: <br />3 -Road Work <br />46 <br />31 24 13 00-0005 <br />0038 MOD <br />For Up To 20, Add <br />$24.97 <br />Qty Unit Price <br />Factor <br />Total <br />Installation 4.15 X $5.19 X <br />1.1594 <br />$24.97 <br />47 <br />32 11 29 13-0003 <br />SY <br />8" Thick FDOT Limerock <br />$1,555.34 <br />Qty Unit Price <br />Factor <br />Total <br />Installation 17.78 X $75.45 X <br />1.1594 <br />$1,555.34 <br />Contractor Notes: <br />Asphalt Work = 4 x 40 = 160/9 = 17.78 SY <br />48 <br />32 1129 13-0003 <br />0008 MOD <br />For Up To 500, Add <br />$329.21 <br />Qty Unit Price <br />Factor <br />Total <br />Installation 17.78 X $15.97 X <br />1.1594 <br />$329.21 <br />49 <br />32 12 13 19-0003 <br />SY <br />Surface Prime Coat, 0.30 Gallon/SY <br />$42.26 <br />Qty Unit Price <br />Factor <br />Total <br />Installation 17.78 X $2.05 X <br />1.1594 <br />$42.26 <br />Contractor Notes: Asphalt Work = 4 x 40 = 160/9 = 17.78 SY <br />50 <br />32 12 16 13-0064 <br />TON <br />Friction Course With Rubber, FC -5 <br />$1,164.05 <br />Qty Unit Price <br />Factor <br />Total <br />Installation 3 X $334.67 X <br />1.1594 <br />$1,164.05 <br />51 <br />32 12 16 13-0064 <br />0587 MOD <br />For Up To 5, Add <br />$1,018.56 <br />Qty Unit Price <br />Factor <br />Total <br />Installation 3 X $292.84 X <br />1.1594 <br />$1,018.56 <br />Subtotal for 3 -Road Work: $8,618.54 <br />4 -Additional Scope of Work <br />52 01 71 1300-0003 EA Equipment Delivery, Pickup, Mobilization And Demobilization Using $2,988.52 <br />A Tractor Trailer With Up To 53' Bedlncludes loading, tie -down of <br />equipment, delivery of equipment, off loading on site, rigging, <br />dismantling, loading for return and transporting away. For <br />equipment such as bulldozers, motor scrapers, hydraulic <br />excavators, gradalls, road graders, loader-backhoes, heavy duty <br />construction loaders, tractors, pavers, rollers, bridge finishers, <br />straight mast construction forklifts, telescoping boom rough terrain <br />construction forklifts, telescoping and articulating boom man lifts <br />with >40' boom lengths, etc. <br />Qty Unit Price Factor Total <br />Installation 2 X $1,288.82 X 1.1594 $2,988.52 <br />Contractor Notes: 1 mobilization for Demolition and excavation and 1 Mobilization for <br />Delivery of the New Structure <br />Contractor Price Proprosal Details - Category 6 of 8 <br />This report was not generated or reviewed by your Account Manager of The Gordian Group <br />