Laserfiche WebLink
OMNIA Partners <br />The terms and conditions of OMNIA Partners Master Contract R220701 "Facility Technology Integration <br />& Security System Services" apply in addition to the Everon LLC standard terms and conditions. In the <br />event of a conflict of terms, the OMNIA Partners Master Contract R220701 terms will prevail. <br />EVE RON WILL PROVIDE AND INSTALL THE FOLLOWINGS ECURITY EQUIPMENT <br />SUNNY ISLES ANNEX BUILDING <br />ACCESS CONTROL <br />Each access control door will have a bio -reader, locking hardware with DSM, door <br />release button and door release button. Communication cables will be installed from <br />the access control panel IDF room to each of the access control doors. <br />The following devices will be provided and installed for City of Sunny Isles Beach <br />Annex Building. <br />• 1 - KT -8 IP access control panel dual voltage <br />• 2 - KT -4 -PCB IP controller <br />• 1 - Power supply with lockable enclosure <br />• 4 -Sigma Extreme - 293701737 exterior door <br />• 1 - Sigma Lite+ - 293678660 interior door <br />• 6 - Locking hardware maglock type with DSM <br />• 5 - Door release buttons <br />• 5 -Motion sensors <br />• Cabling to support devices <br />City of Sunny Isles will need to provide an IP address for the access control panel. <br />Everon will program the panel and devices. Customer will program access personnel <br />levels details. <br />DIRECTIONAL BORE <br />The pathway for directional bore will be from Government Center Building <br />Communication room 174 to Annex building OF room. Conduit will be installed from <br />communication room 174 to the edge of the parking garage. Directional bore from <br />edge of parking garage to open trench next to FPL transformer. Conduit will be <br />installed in the trench to Annex IDF. Fiber will be installed from Government Center <br />Building communication room 174 to Annex IDF room. Fiber will be terminated in a <br />FDP at both ends. FDP will be installed in existing network rack. The following will be <br />part of the directional bore installation: <br />• Ground Penetrating Radar <br />• Conduit and install from Annex IDF in open trench next to FPL transformer <br />• Conduit and directional bore from FPL transformer to Government Center <br />Building <br />1IPage <br />464 <br />